BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a detention facility in South Salt Lake, Utah. Working plans call for the renovation of a detention facility.

The bonding range is $4.8 million to $5.4 million. Salt Lake County is soliciting proposals from qualified general contractors to provide construction services to Salt Lake County for the Adult Detention Center [ADC] Kitchen Renovation Project. This solicitation is the first stage of a Two-Stage Bidding process. Stage I will involve the short-listing of general contractors based on the selection criteria outlined in this Request for Qualifications (RFQ). 2-5 general contractors (Contractors) who are selected to advance pursuant to this RFQ shall be allowed to submit bids for Stage II of the selection process. The Stage II award will subsequently be made to the lowest responsible and responsive bidder. SCOPE OF WORK/BACKGROUND The Salt Lake County Metro Jail [ADC] was designed and built during the years 1997 to 2000. The facility was opened to house inmates and support County Sheriff's staff in the calendar year 2000 and has been in continuous operation since then. As with any aging facility the Adult Detention Center Metro Jail has experienced various operational and procedural changes over the many years of its operation. The kitchen was originally designed to provide adequate facilities and was even overdesigned for future expansions, however during its use it has aged dramatically, and the components and equipment also have exceeded useful lifespan. The kitchens layout and design as it currently operates is not efficient and does not provide adequate flow or proper staffing configurations. Salt Lake County is soliciting qualified construction firms to assist in a major renovation of the existing kitchen which should anticipate a complete demolition of the existing kitchen, replacement of electrical, mechanical, architectural, structural such as floors and walls, to prepare the kitchen in general for future expansions. Eight months will be granted for this needed upgrade and renovation of a vital operational component for the Adult Detention Center Metro Jail. SCHEDULE It is anticipated that the bid documents will be distributed for Stage II bids the week of August 12th and a Notice to Proceed (NTP) for the project is expected in September 2024; Final Acceptance will need to be completed eight months from NTP. Rejection of Proposals: Any proposal containing significant deviations from the specifications of the RFQ shall be considered non-responsive and may be rejected in whole or in part. LAST DAY TO SUBMIT QUESTIONS AND SUBSTITUTION REQUESTS All questions regarding the RFQ shall be submitted through U3P no later than July 30, 2024, at 1:00 PM. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Final Planning

Jails / Prisons

$5,400,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
111
Active Projects
67
Bidding Soon
983
All Active Projects
387
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 6, 2024

March 12, 2025

May 2, 2025

img_map_placeholder

3415 S 900 W, South Salt Lake, UT

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.