Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 23, 2024 at 8:00 PM
Updated August 24, 2024
Site work for a mixed-use development in Safford, Arizona. Completed plans call for site work for a water / sewer project.
FCI SAFFORD currently has a 1-million-gallon storage tank that is used to store the water to service the institution. The storage tank is a metal structure and was built in 2008. In a recent inspection it was noted that the interior tank ceiling showed coating deterioration and flaking. This tank is equipped with an exterior ladder cage and does not have the wire safety climb. The interior ladder is in good condition however the safely climb has heavy corrosion. On inspection of the roof hatch there was visible daylight from inside the tank. The Contractor shall be responsible for completing the following repairs and remedies: 1. Remove exterior ladder cage and replace with (2) 30ft wire safety climb. 2. Remove interior ladder safety climb. 3. Spot epoxy repair to the interior ceiling and ladder. 4. Install a hatch gasket 5. Install (2) OSHA confined space entry placards at the base of ladder, and at roof access hatch. ******The storage tank will need to stay in service while repairs are being performed.******
Award
Jails / Prisons
$15,714.00
Public - Federal
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
11
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 14, 2024
September 13, 2024
1529 AZ-366, Safford, AZ
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
