BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 24, 2025 at 8:00 PM

Updated July 25, 2025

Site work for a playground / park / athletic field in Breckenridge, Colorado. Completed plans call for site work for a playground / park / athletic field.

As of July 24, 2025, a design firm and contractor have been selected, but this project is currently on hold. Reference Number : 0000357830 The Breckenridge Recreation Center Ballfield Pavilion is located within Kingdom Park at 880 Airport Road, in Breckenridge, Colorado. There are two baseball fields south of the Recreation Center and the space between the two fields is the focus of this project. The baseball fields are currently getting artificial turf installed and the goal is to be able to host high school baseball and other baseball games at these fields in the future. The following paragraphs describe the goals and features to be addressed in the Proposal. Job Location 880 Airport Road, in Breckenridge, Colorado Question Deadline: 07/29/2024 at 5:00 PM MT , Questions are submitted online : No . Written inquiries shall be directed to: Kendra Hane Senior Engineer kendrah@townofbreckenridge.com The TOWN shall provide a copy of its written response to any inquiries received to all proposers made known to the town. Accessibility: With wanting to host more games in this space, the accessibility and meeting Americans with Disabilities Act (ADA) becomes the top priority. Currently the space between the two baseball fields has many levels and uneven steps. Visibility: Currently the entry to the area between the ballfields is hidden by the island to enter the parking lot. The island should be taken out and a more visible space with a sign identifying the space should be included in the proposal. Connectivity: Connection from the entrance to the ballfields to the Blue River Recreation Path. Required Features: Pavilion: The space will need a bathroom with two accessible (ADA) stalls with a janitor's room and storage room attached to it. The janitor's room needs to be a minimum of 100 square feet and will house utilities for the plumbing for both the water refill stations, toilets, and sinks. On the outside of the pavilion, at least 2 water filling stations are to be included. Additionally, a storage room separate from the janitor's room would be beneficial for storing some baseball equipment. Batting Cages and Warm-up Turf: Provide two batting cages and an additional area with artificial turf for doing warm-ups before a game. Viewing Area: The Proposal should look into a way to potentially have some seating that allow viewing of both ballfields at the same time. Include a shade structure over the viewing area. Playground: Investigate the location of the playground and if a new playground should be installed or an option for reusing the existing playground. The TOWN reserves all rights to investigate the qualifications of any and all individuals and firms under consideration, to perform a financial audit of one or more firms, to confirm any part of the information furnished in a proposal, and to require further evidence of managerial, financial or professional capabilities which are considered necessary for the successful performance of work described in this RFP. The TOWN reserves the right to reject any or all proposals and to waive informalities and minor irregularities in proposals received. The method of Contractor Selection has not been Determined at this time.

Award

Playgrounds / Parks / Athletic Fields

$400,000.00

Public - City

Site Work

3

5

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
189
Active Projects
69
Bidding Soon
1,357
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 3, 2025

Project location map

880 Airport Rd, Breckenridge, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.