BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 27, 2025 at 8:00 PM

Updated October 28, 2025

Demolition, site work, paving and new construction of a civil project in Marlette, Michigan. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; road / highway; and road / highway.

0.12 mi of bridge removal and replace with culvert including hot asphalt reconstruction, guardrail work, pavement markings on M-53 over Greenman Creek, Sanilac County. This is a Digital Delivery Pilot Project. Mandatory pre-bid training will be held Thursday, September 18, 2025, from 9:00am to 12:00pm at the MDOT Bay Region Office, 5859 Sherman Road, Saginaw, Michigan 48604 or a hybrid virtual Microsoft Teams meeting option. 4% Dbe Participation Required Net classification required for this project is 2705 Ea or 2705 Fa In addition to the above minimum prequalification requirement for prime contractors this project includes subclassifications of Ea and Fa. If the prime contractor is not prequalified in those subclassifications it must use prequalified subcontractors. Those subcontractors must be designated prior to award of the contract to the confirmed low bidder. Control Sec Job No Federal No BFP 74012 214903A 25A0958 Completion Date:7/31/2026 MIDOT - 2510 701 - Bridge Removal and Replace With Culvert Including Hot Asphalt Reconstruction, Guardrail Work, Pavement Markings on M-53

Award

Bridges / Tunnels

$2,548,584.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

10

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
77
Active Projects
3
Bidding Soon
1,317
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 17, 2025

March 2, 2026

Project location map

M-53, Marlette, MI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.