BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Joliet, Illinois. Completed plans call for the renovation of a water / sewer project.

Well 27D Rehabilitation. Any questions or clarifications concerning these specifications should be in writing and directed to the Purchasing Division at purchasing@joliet.gov. All bidders will be required to submit Bid Security in the form of a Certified Check, Cashier's Check, or a Bid Bond in the amount of Ten percent (10%) of the Base Bid, payable to the City of Joliet. Performance Security: 100%. The potential vendor/contractor remains responsible for obtaining all addenda to the original specification so they should check the specific bid page before submitting a Bid to make sure they have received all addenda to a specific contract. Bidders are to acknowledge receipt of all addenda within the sealed bid package. PROJECT COMPLETION DATE The project completion date, including the completion of the final punch list and the completion of the final inspection with the Owner and the Engineer will be December 31, 2024. LIQUIDATED DAMAGES As actual damages for any delay in completion of the work which the Contractor is required to perform under this contract are impossible of determination, and the City and the public will suffer damage from delay in the completion of this contract, the Contractor and his sureties shall be liable for and shall pay to the City of Joliet, Illinois the sum of Two Hundred Dollars ($250.00) as fixed, agreed and liquidated damages for each calendar day of unjustified deviation from the date specified in the proposal for completion. The City of Joliet reserves the right to reject any and all bids, parts of any and all bids, or to waive technical errors or omissions in bids. RESPONSIBILITY OF BIDDERS No contract will be awarded to any person, firm, or corporation that is in arrears to the City of Joliet, Illinois upon any debt or contract, or who has failed to execute in whole or in part, in a satisfactory manner, any contract with the City of Joliet, or who is a defaulter as to surety or otherwise upon any obligation to the City of Joliet, Illinois. Any questions or clarifications concerning these specifications should be in writing and directed to the Purchasing Division at purchasing@joliet.gov. Scope of Work 1-1.1 The work to be done hereunder includes the furnishing of all labor, material, transportation, tools, supplies, plant, equipment and appurtenances unless hereinafter specifically excepted, necessary for the complete and satisfactory removal and repair of the vertical turbine well pump from the well at the Well 27D on 801 Barberry Way in Joliet, Illinois. General Description of the Well 1-1.7 The well was originally drilled in June 2006 by Layne Christensen Company, Aurora, Illinois. The current pumping equipment is as follows: 400 Horsepower Byron-Jackson Type H 17" motor 2300 Volt 1060 feet 8" column pipe 15 stage Byron Jackson 13/12 MQH pump Design point 1100 GPM @ 1206 feet TDH @ 1760 RPM The well log is as follows: 0 -80 24" cemented well casing +2 - 1050 18" cemented well casing 1523 TD

Award

Water / Sewer

$189,700.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
383
Active Projects
180
Bidding Soon
3,062
All Active Projects
1,368
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 8, 2024

September 9, 2024

December 31, 2024

img_map_placeholder

801 Barberry Way, Joliet, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.