BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and new construction of a mixed-use development in Winter Park, Colorado. Working plans call for the construction of a clubhouse / community center; for site work for a clubhouse / community center; road / highway; and for paving for a road / highway.

A description of the Work to be performed includes but is not limited to: construction of a community center including survey, earthwork, concrete, masonry, HVAC, electrical systems, radiant heat, outdoor amenities, a pool, fire pit, concrete flatwork, asphalt paving, storm sewer, and any and all other work necessary to complete the work in accordance with Contract Documents including the plans and specifications. Question Deadline 08/19/2024 All questions and clarifications shall be in writing and directed to: Brandon Collins, PE Roam Metropolitan District No. 1 District Engineer Independent District Engineering Services, LLC 1626 Cole Boulevard, Suite 125 Lakewood, CO 80401 E-mail: bcollins@idesllc.com Cody Conry Roam Metropolitan District No. 1 District Engineer Independent District Engineering Services, LLC 1626 Cole Boulevard, Suite 125 Lakewood, CO 80401 E-mail: cconry@idesllc.com A Bid Bond in an amount equal to ten percent (10%) of the total Bid amount will be required. The Bid Bond will be retained by Owner as liquidated damages should the Successful Bidder fail to enter into a Contract with the Owner in accordance with the Bid. Bidders must supply a list of Subcontractors and Suppliers providing $10,000 or more in labor and/or materials to the Project If not provided earlier, Bidders shall be required to submit a completed AIA A305 Qualifications Contractor Statement, or equal, including all attachments. The Owner will not provide the form. Attention is called to the fact that Bidders offer to assume the obligations and liabilities imposed by the Contract Documents. The Successful Bidder for the Project will be required to furnish a Performance Bond, a Labor and Materials Payment Bond and Warranty Bond in the full amount of the Contract Price, in conformity with the requirements of the Contract Documents. These are not due with the Bid, but will be required by the Successful Bidder with the signed Agreement. All Documents and Addenda that were provided with the above said Bid Package shall apply to this bid and will be provided with the above-mentioned Contract Documents when applicable. Bidders are hereby advised that the Owner reserves the right to not award a Contract until ninety (90) days from the date of the opening of Bids, and Bidders expressly agree to keep their Bids open for the ninety (90) day time period. Owner reserves the right to reject any and all Bids, to waive any informality, technicality or irregularity in any Bid, to disregard all non-conforming, non-responsive, conditional or alternate Bids, to clarify contract terms with the Successful Bidder, to require statements or evidence of Bidders' qualifications, including financial statements, and to accept the proposal that is in the opinion of the Owner in its best interest. Owner reserves the right to accept any combination of Bids which in Owner's sole, and absolute judgment will, under all circumstances, best serve the Owner's interests. Owner also reserves the right to extend the Bidding period by Addendum if it appears in its interest to do so. The Owner reserves the right to award multiple contracts to multiple Bidders. Additional Bidder requirements are included in the Contract Documents. Any and all questions concerning this bid shall be directed in writing to: Brandon Collins, PE Independent District Engineering Services, LLC Roam Metropolitan District No. 1 Engineer 1626 Cole Boulevard, Suite 125 Lakewood, CO 80401 E-mail: bcollins@idesllc.com [bcollins@idesllc.com] Cody Conry Independent District Engineering Services, LLC Roam Metropolitan District No. 1 Engineer 1626 Cole Boulevard, Suite 125 Lakewood, CO 80401 E-mail: cconry@idesllc.com [cconry@idesllc.com] Contacting the Design Engineer, District Representatives, Local Jurisdictions or others involved in the development of the Project shall be reason for the Bidders Bid to be rejected. Responses to questions and clarifications shall be by written Addendum only, verbal responses are non-binding. Project has been cancelled.

Final Planning

Clubhouse / Community Centers

$300,000.00

Public - City

New Construction, Paving, Site Work

33

5

41

5

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
92
Active Projects
36
Bidding Soon
965
All Active Projects
408
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 12, 2024

January 3, 2025

img_map_placeholder

79303 US-40, Winter Park, CO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.