BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Edisto Island, South Carolina. Completed plans call for site work for a playground / park / athletic field; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Description: Provide architectural/engineering services to design and to provide the necessary labor, material, equipment, and supervision to construct a boardwalk at Burley Lyons Park, 714 Portia St. Edisto Beach, South Carolina, 29438. BOND: A performance bond, executed by a surety company, in the amount equal to 100 percent of the contract price that does not include the cost of operation, maintenance, and finance will be required for contracts in excess of $50,000.00. A payment bond, executed by a surety company, in the amount equal to 100 percent of the contract price that does not include the cost of operation, maintenance, and finance will be required for contracts in excess of $50,000.00. SCOPE OF WORK o The Town of Edisto Beach is seeking professional design and construction services for a boardwalk at Burley Lyons Park. The design shall meet or exceed currently adopted codes of the Town of Edisto Beach and all state and federal codes and regulations including, but not limited to, the 2017 ICC A117.1 Accessible and Usable Buildings and Facilities. A listing of subcontractors will be required with the submitted sealed bid, including but not limited to, architect, engineer, site development contractor, building contractor, electrician, plumber and/or any trade as needed to complete the project. The appropriate South Carolina Labor, Licensing, and Regulation registration number shall be included in the listing. Subcontractor substitutions shall be allowed per Town Ordinance Sec.2-234(g) Subcontractor substitution. o The proposed boardwalk will be approximately 190' long and 4' clear width with guardrails on both sides with a 10' by 20' fixed pierhead. The preferred footprint will follow Figure 7: Burley L. Lyons Park Concept A, items 4 and 5 from the legend, as depicted within the Edisto Beach Recreation Master Plan; an excerpt is included below. The Town has a draft site plan, a new site plan will be needed for all permitting with updated or missing information completed. o Include all sitework needed to prepare the location for the sistant. Stainless Steel bolts, washers, nuts, screws, hangers, etc. All framing materials shall be appropriately treated for the location and placement. o Materials used for the boardwalk construction are desired to be: o 2x6 treated #2 or better prime for the walking surface with stainless steel screws o 2x4 treated #2 or better prime installed horizontally for the guards with stainless steel screws o 2x6 treated #2 or better prime installed for the top rails with stainless steel screws. boardwalk. This may include,o 4x4 treated #2 or better for the intermediate guard support with stainless steel bolts used to attach to the structure and stainless steel screws for the guards o Two sample pictures provided at the end of the "Scope or Work" section. but it not limited to, brush/limb removal and removal of any existing amenities currently in the proposed footprint. o The contractor will be responsible for supplying a waste dumpster and temporary restroom facilities. There is no electricity or potable water on site. o The awarded professional or contractor will be responsible for acquiring all necessary permits through SCDHEC-OCRM, the Town of Edisto Beach, and any other applicable organization. Town issued business license(s) will be required for all companies and subcontractors. o All materials used in construction shall be corrosion resi

Bid Results

Sidewalks / Parking Lot

$500,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
69
Active Projects
44
Bidding Soon
469
All Active Projects
231
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 23, 2024

December 23, 2024

img_map_placeholder

714 Portia St, Edisto Island, SC

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.