Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving and outdoor lighting for a mixed-use development in Auburn, Washington. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; for outdoor lighting for a road / highway; and water / sewer project.
The project will widen auburn way s between hemlock st se and poplar st se to accommodate two lanes in each direction, center turn lane And/or medians to provide access management where feasible, sidewalks, bus pull-outs, street lighting and storm improvements. The project will Also add an eastbound turnaround and enhanced pedestrian crossing near redwood court. The project length is approximately 0.5 miles. The Project is needed to provide additional vehicular capacity, transit, and non-motorized facilities on the corridor. The scope omits portions of the Project that are being built by the auburn school district's (asd) chinook elementary replacement project. Asd's project will construct a Roundabout at the school driveway on auburn way s instead of the traffic signal originally included in the scope of the city's project. County: King Length : 0.560 Agency: Auburn Begin Termini : Hemlock street se (mp 2.54) End Termini : Redwood court (mp 3.10) As of July 18, 2024, the project is in Conceptual status. Anticipated letting year is 2025. WADOT - Auburn Way S (SR-164) - Hemlock to Poplar *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Roads / Highways
$9,700,000.00
Public - State/Provincial
Outdoor Lighting, Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 4, 2025
WA-164, Auburn, WA
Related To This Project
Auburn, WA
--
Auburn, WA
--
Auburn, WA
--
Auburn, WA
Bid Date: Aug 21 2024
Auburn, WA
Bid Date: Oct 11 2024
Auburn, WA
--
Auburn, WA
Bid Date: Oct 13 2021
Auburn, WA
Bid Date: Jul 24 2024
Auburn, WA
Bid Date: Jul 23 2024
Auburn, WA
Bid Date: Jul 25 2024
Auburn, WA
Bid Date: Jun 26 2024
Auburn, WA
Bid Date: May 21 2020
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.