BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in West Blocton, Alabama. Completed plans call for site work for a water / sewer project.

The project consists of Contract A: Bishop Ridge Road Water Main Replacement; Contract B: Vernon Town Road Water Main Replacement; Contract C: Frog Level Road and Spring Water Source Valve Replacement & Flushing Assembly Installation; Contract D: County Road 9 District Water Meter Installation; Contract E: Town Tank and Smith Hill Tank Upgrades; Contract F: Spring Generator Replacement. There is one set of plans and specifications. The bid form is divided into separate contracts based on the type of work to be performed. Bidders have the option to bid on one contract, multiple contracts, or all contracts. This project consists of: Contract A: Bishop Ridge Road Water Main Replacement Contract B: Vernon Town Road Water Main Replacement Contract C: Frog Level Road and Spring Water Source Valve Replacement & Flushing Assembly Installation Contract D: County Road 9 District Water Meter Installation Contract E: Town Tank and Smith Hill Tank Upgrades Contract E: Town Tank and Smith Hill Tank Upgrades Contract F: Spring Generator Replacement. For assistance with this website, please contact customer service at 205-252-8505 a. Contract A: Bishop Ridge Water Main Replacement i. Substantial Completion: 180 Calendar Days ii. Final Completion: 210 Calendar Days b. Contract B: Vernon Town Road Water Main Replacement i. Substantial Completion: 120 Calendar Days ii. Final Completion: 150 Calendar Days c. Contract C: Frog Level Road and Spring Valve Replacement, Pipe Cleansing Assemblies i. Substantial Completion: 60 Calendar Days ii. Final Completion: 90 Calendar Days d. Contract D: County Road 9 District Meter Installation i. Substantial Completion: 30 Calendar Days ii. Final Completion: 60 Calendar Days e. Contract E: Town Tank and Smith Hill Tank Upgrades i. Substantial Completion: 90 Calendar Days ii. Final Completion: 120 Calendar Days f. Contract F: Spring Pump Station Generator Replacement i. Substantial Completion: 60 Calendar Days ii. Final Completion: 90 Calendar Days

Post-Bid

Water / Sewer

$650,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
60
Active Projects
37
Bidding Soon
574
All Active Projects
231
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 29, 2024

September 30, 2024

img_map_placeholder

Multiple Locations, West Blocton, AL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.