BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Inverness, Florida. Completed plans call for site work for a road / highway; and for paving for a road / highway.

City of Inverness invites established firms, licensed by the State of Florida, to submit sealed bids for the City of Inverness Inverness Street Resurfacing All work for the Project shall be constructed in accordance with the Specifications prepared by the Owner. Bids shall be submitted for demolition, disposal, furnishing, delivering, and installing all materials, equipment, and services, including labor for the Work, which generally involves the following activities: Milling and resurfacing approximately 3.22 miles of residential roadway. Road segments included in this resurfacing project include the following: 1. Seminole Ave. - From US 41 to W. Highland Ave. - 0.25 Miles 2. Mossy Oak Dr. - From Hoffman Ln. to End - 0.16 Miles 3. Elm Ct. - Entire Length - 0.03 Miles 4. Peterson Ct. - Entire Length - 0.02 Miles 5. W. Grace St. - From S. Line Ave. to US 41 - 0.56 Miles 6. Poe St. - Old Floral City Rd. to Longfellow Ter. - 0.22 Miles 7. Holmes Ave. - From Eden Dr. to Emerson St. - 0.08 Miles 8. Emerson St. - From Cooper Ave. to Greenleaf Ave. - 0.16 Miles 9. Greenleaf Ave. - From Emerson St. to Claymore St. - 0.06 Miles 10. Lakeshore Dr. - Full Length - 0.35 Miles 11. Knob Hill St. - Entire Length - 0.08 Miles 12. Hillside Ct. - From Old Floral City to Lakewood Dr. - 0.08 Miles 13. Lakewood Dr. - From Mossy Oak Dr. to Hillside Ct. - 0.13 Miles 14. Meadow Ln. - From Old Floral City Rd. to Lakewood Dr. - 0.08 Miles 15. Grove Manor Blvd. - From Pleasant Grove Rd to Sweet Pine Pt. - 0.13 Miles 16. Great Pine Pt. - Entire Length - 0.18 Miles 17. Sweet Pine Pt. - Entire Length - 0.19 Miles 18. S. Woodlawn Ave. - Entire Length - 0.09 Miles 19. W. Circlewood St. - Entire Length - 0.12 Miles 20. E. Circlewood St. - Entire Length - 0.08 Miles 21. Stotler Ave. - From SR 44 to Leroy Bellamy Rd. - 0.17 Miles Construction time to achieve Substantial Completion is 90 consecutive calendar days from the date of the Notice to Proceed, with an additional 30 consecutive calendar days to achieve Final Completion (120 days total). For more information, contact Gary Downing with H. W. Lochner at (813) 357-3750 or gdowning@hwlochner.com. All bids shall be prepared using the Bid Package and Specifications. Addenda will be sent via e-mail to all plan holders up to seventy-two (72) hours before the Bid closing time. The Owner is not responsible for delivery of addenda to prospective bidders. A 5% bid security will be required for this project, if contract price exceeds $100,000. The Owner will require that the Contractor furnish a Performance and Payment Bond in an amount equal to 100% of the Contract Price, if it exceeds $100,000. All Payment and Performance Bonds shall be secured from or countersigned by an agency or surety company recognized in good standing and authorized to do business in the State of Florida. The City of Inverness reserves the right to waive formalities, waive any technical defects, reject any and all bids, and accept any bid which represents the lowest and best offer to the City. Contact Person: To request bid packet: Susan Jackson, City Clerk @ (352) 726-2611 ext. 1007 or sjackson@inverness.gov To submit questions: Gary Downing @ (813) 357-3750 or gdowning@hwlochner.com Business Hours: Monday-Friday 8:00am - 5:00pm Fax Number: (352) 726-0607 The person submitting the request shall be responsible for its delivery to the Owner at least seventy-two (72) hours prior to the bid opening. 2. All questions concerning the bid documents shall be directed to the Owner by email to sjackson@Inverness.gov

Award

Roads / Highways

$1,164,234.00

Public - City

Paving, Site Work

41

6

4

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
127
Active Projects
68
Bidding Soon
1,237
All Active Projects
502
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 5, 2024

September 4, 2024

img_map_placeholder

Multiple Locations, Inverness, FL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.