EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 13, 2024 at 8:00 PM

Updated October 1, 2024

Site work, paving and outdoor lighting for a mixed-use development in Chester, Pennsylvania. Completed plans call for site work for a playground / park / athletic field; for outdoor lighting for a playground / park / athletic field; sidewalk / parking lot; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Scope of work includes new playground equipment, rain garden, concrete sidewalk, site lighting conduit and ADA upgrades. Bidders are required to submit a surety in the form of a bond or equivalent meeting 10% of the overall bid price in compliance with the contract documents. Bid bonds will be returned to the non-awarded bidders upon the execution of the contract. The successful Bidder shall also be required to provide a Performance Bond in an amount of one hundred percent (100%) of the Contract amount within ten (10) calendar days of receipt of written notice of acceptance of the Bid. The Successful Bidder who is awarded the contract, will be required to pay online a fee of 0.0033% (1/3 of 1 percent) up to $5,000 of the contract award value. Bidders are not permitted to contact the Township Engineer or staff directly. The bidders are made aware that the project is subject to PA Prevailing Wage Requirements. The contract documents contain all pertinent regulations. The Township reserves the right to reject any or all bids or to accept any portion of any bid, and to award contracts as is deemed best for the Township. All interested parties must submit questions via PennBid website by the posted deadline. Questions Due Date: Aug 5th 2024, 4:00 PM EDT

Bid Results

Playgrounds / Parks / Athletic Fields

$312,940.00

Public - City

Outdoor Lighting, Paving, Site Work

9

10

4

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Quality Requirements, References, Reference Standards, Execution and Closeout Requirements, Examination and Preparation, Execution, Erection, Closeout Submittals, Bonds, Project Record Documents
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Joint Protection, Preformed Joint Seals, Joint Fillers
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Tiling, Wall Finishes, Stone Facing
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 12 - Furnishings

Division 12 - Furnishings

Multiple Seating, Pews and Benches, Benches
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Rough Grading, Excavation and Fill, Subgrade Preparation, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Mowing, Watering, Common Work Results for Exterior Improvements, Bases, Ballasts, and Paving, Planting, Turf and Grasses, Seeding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Fuel Distribution Utilities, Natural-Gas Distribution, Natural-Gas Piping, Hydronic and Steam Energy Utilities, Steam Energy Distribution, Underground Steam and Condensate Distribution Piping
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
357
Active Projects
192
Bidding Soon
2,880
All Active Projects
1,292
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 9, 2024

September 9, 2024

img_map_placeholder

To Be Determined, Chester, PA


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Yarnall Park Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.