BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a military facility in Anchorage, Alaska. Completed plans call for the renovation of a military facility.

The contractor shall provide material and services to include but not limited to the removal of the existing door set to include the locking mechanisms, ensuring not to damage the integrity of the existing wall structure on the interior or exterior of the facility. Replace the two existing rollup doors in Building 8288 with three CSI section 08 34 00 High Speed Doors, (1) 15' wide x 14' tall; and (1) 24' wide x 20' tall. Replace the three existing rollup doors in Building 9361 with three CSI section 08 34 00 High Speed Doors, (1) 15' wide x 15'4" tall; (1) 20' wide x 16' tall and (1) 24' wide x 20' tall. Once doors are removed opening must be secured as to ensure the security of the facility at night. The contractor will be responsible for loading and transporting all debris generated from the removal of the doors and installation of the new doors to and from building 9361 and building 8288. They will properly dispose of the material in accordance with local laws and regulations. Door Specifications/Requirements: CSI Section 08 34 00 High Speed Rubber Door (2) Doors Total, (1) 15' wide x 14' tall; and (1) 24' wide x 20' tall. CSI Section 08 34 00 High Speed Rubber Door (3) Doors Total, (1) 15' wide x 15'4" tall, (1) 20' wide x 16' tall, and (1) 24' wide x 20' tall Curtain: Rubber and Black in color. Operation: Variable Speed direct-drive AC motor with dynamic braking. Springless design with no counterbalance. 3 Phase power exist in current facility. System 4 controller with self-diagnostic capabilities in NEMA 4X rated enclosure. Release and restore technology after impact (no tools needed). Actuators: (1) Remote open/close/stop push buttons. Safety equipment; (2) Through beam photo eyes. Chain hoist for manual operation. Activation: (2) Motions sensors on west end and supply door. Radio control: Receiver with (1) button transmitters inside dispatch office. Windows: Clear windows 2 for each door. PROJECT LOCATION: This project shall be completed as replacement and installation of two new high speed rubber doors at building 8288/9361 on Joint Base Elmendorf-Richardson, AK. Project hours are standard work hours 0700-1600 not to include Federal holidays or weekends. Any questions shall be directed to the POCs listed below IN WRITING to the email addresses manuel.granadosus.af.mil and cassidy.nieblasus.af.mil no later than 12pm AKDT on 26 July 2024.

Award

Military

$310,314.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
7
Active Projects
1
Bidding Soon
127
All Active Projects
52
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 14, 2024

September 13, 2024

img_map_placeholder

10471 20th St, Anchorage, AK


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.