Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving and new construction of a bridge / tunnel in Lynnwood, Washington. Working plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
Construct the new multimodal six-lane bridge over I-5 between the intersections of 196th Street SW (State Route 524) & Poplar Way and 33rd Avenue W & Alderwood Mall Boulevard. The bridge will provide for multimodal travel with a sidewalk (west side) and shared use path (east side). The two intersections will be modified to meet the profile and width of the new bridge, and a tunnel (three sided concrete box structure) will be constructed to allow the Interurban Trail to pass beneath the new bridge. Widening and restriping of portions of Poplar Way, 196th Street SW, Alderwood Mall Boulevard, 33rd Avenue W, and Alderwood Mall Parkway are also included. County: Snohomish Agency: Lynnwood Length : 0.400 Begin Termini : Poplar Way/Alderwood Mall PKWY End Termini : 33rd Ave W/Alderwood Mall BLVD As of July 22, 2024, the project is in Final Planning status. Anticipated letting year is 2024. WADOT - Connecting Lynnwwod: Poplar Way Bridge *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Final Planning
Bridges / Tunnels
$50,005,112.00
Public - State/Provincial
New Construction, Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 1, 2024
33rd Ave W, Lynnwood, WA
Related To This Project
Lynnwood, WA
--
Lynnwood, WA
--
Lynnwood, WA
--
Lynnwood, WA
Bid Date: Aug 13 2024
Lynnwood, WA
Bid Date: Aug 01 2024
Lynnwood, WA
Bid Date: Jul 31 2024
Lynnwood, WA
Bid Date: Aug 27 2024
Lynnwood, WA
Bid Date: Oct 01 2024
Lynnwood, WA
--
Lynnwood, WA
--
Lynnwood, WA
--
Lynnwood, WA
--
Lynnwood, WA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.