BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 5, 2025 at 8:00 PM

Updated September 6, 2025

Site work, paving and new construction of a bridge / tunnel in Lynnwood, Washington. Conceptual plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Consultants for Connecting Lynnwood: Poplar Way Bridge the City of Lynnwood Solicits Interest From Consulting Firms With Expertise in Civil and Structural Engineering Design. This Agreement Will Be for Approximately 3 Years in Duration With the Option for the City of Lynnwood to Extend It for Additional Time and Money if Necessary. Consultants Will Be Considered for the Following Project. The City of Lynnwood Reserves the Right to Amend Terms of This Request for Qualifications (Rfq) to Circulate Various Addenda, or to Withdraw the Rfq at Any Time, Regardless of How Much Time and Effort Consultants Have Spent on Their Responses. Project Description the Work to Be Performed by the Consultant Consists of Construction Management/construction Administration (Cm/ca)associated With the Connecting Lynnwood: Poplar Way Bridge Project (Lyn-38). Construction is Anticipated to Begin January 2026 and Will Have Approximately 470 Working Days. This Includes but is Not Limited to Construction Project Management, on-site Daily Construction Observation, Inspection, Materials Testing, and Management, and Documentation Control. This Project Has a Voluntary 10% Small Business Enterprise (Sbe) Goal. Submittal of an Sbe Participation Plan is Required Prior to Commencing Work. Evaluation Criteria Submittals Will Be Evaluated and Ranked Based on the Following Criteria: Qualifications of Proposed Construction Manager, Qualifications of Team, Experience of Firm on Similar Projects, Ability to Meet Schedule, Approach to Project, Familiarity With Wsdot/fhwa Standards , Past Performance and References, Approach to Meet the Voluntary Sbe Goal (Sbe Participation Plan), and Others Listed in the Full Rfp. The method of Contractor Selection has not been Determined at this time.

Conceptual

Bridges / Tunnels

$54,970,112.00

Public - City

New Construction, Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
194
Active Projects
89
Bidding Soon
1,795
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 17, 2026

Project location map

Multiple Locations, Lynnwood, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.