BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 5, 2025 at 7:00 PM

Updated November 6, 2025

Site work and paving for a mixed-use development in Niles, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

As of November 5, 2025, project work completed. Engineer not identified. Dempster Street is an IDOT minor arterial with two travel lanes in each direction, left turn lanes, and carries Pace bus service. This project was identified in the Niles Bicycle and Pedestrian Plan Update 2022 as SUP-09 Dempster Street Shared Path Cumberland Avenue to Milwaukee Avenue. This portion of the project recommends constructing a sidewalk on the south side of Dempster Street along Maryhill Cemetery from Cumberland Avenue to Milwaukee Avenue. As a key recommendation from the Village of Niles Bicycle and Pedestrian Plan Update and a Tier 1 Priority Gap as identified by the NWMC, the plan recommends construction of a 10-foot-wide path along the south side of Dempster Street (US Route 14) from Cumberland Avenue to Milwaukee Avenue (IL 21)

Occupancy

Roads / Highways

$400,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
499
Active Projects
275
Bidding Soon
3,613
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 1, 2024

Project location map

Dempster St, Niles, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.