BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Niles, Illinois. Working plans call for site work for a water / sewer project.

The owner has already selected a Design Builder Milwaukee Avenue Water Main Lining Design Build Nothing herein is intended to exclude any responsible firm, or in any way restrain, or restrict competition. All responsible and eligible firms are encouraged to submit proposals. The Village of Niles reserves the right to accept or reject any or all proposals, to waive informalities or technicalities in any proposal, and to accept the proposal which it deems to be in the best interests of the Village. Question Deadline 09/25/2024 All questions to be emailed to Susan Bus, Purchasing Agent at slb@vniles.com five days prior to due date to allow sufficient time for a written response. There are two primary services required for this Project: 1. Watermain lining design, permitting, and preconstruction services 2. Watermain lining construction and construction management The respondent must submit a team covering all portions of the scope of work. 1) Watermain Lining Improvement Design, Permitting and Preconstruction services The watermain rehabilitation design shall meet the following performance specifications: a. Design or performance specifications for temporary bypass systems including functionality for customer water metering. b. Cured in Place Pipe (CIPP) Lining AWWA Class IV for 16" diameter with water services reestablish via robot or other trenchless technology. CIPP Lined pipe to be pressure tested per ASTM F1216-16-18.3. c. Water system disinfection in accordance with AWWA and IEPA standards. d. Replace all gate valves and perform vault repair or replacement in accordance with Village standards. e. Replace all hydrants with Village standard hydrants. f. Perform existing C factor test to determine existing flow conditions. Perform post project C factor test to document flow capacity to match or improve over existing

Pre-Construction/Negotiated

Water / Sewer

$2,000,000.00

Public - City

Site Work

7

9

2

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
186
Active Projects
99
Bidding Soon
1,936
All Active Projects
835
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 2, 2024

May 1, 2025

img_map_placeholder

N Milwaukee Ave, Niles, IL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.