BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a mixed-use development in Shoreline, Washington. Working plans call for site work for a road / highway; for outdoor lighting for a road / highway; sidewalk / parking lot; for paving for a sidewalk / parking lot; transportation facility; bridge / tunnel; and bridge / tunnel.

I-5 forms a barrier for direct access to the sound transit shoreline south/148th station from east side neighborhoods. The 148th street nonmotorized bridge project will design a ped/bike bridge spanning I-5 and connecting to the north-end station plaza area. Improvements will include Integration with the light rail station plaza area (east side of I-5) including ramps and stairs. West side landing improvements will include ramps And a shared use path connecting 1st avenue ne. This project will be designed and constructed in two separate phases:1) phase 1 (sl-25a) will Include full project design and construction of the improvements on the east side of I-5.2) phase 2 (sl-25b) will include right-of-way acquisition And construction of the improvements on the west side of the freeway, including the bridge superstructure. Length : 0.000 County : King Agency : Shoreline Begin Termini : N 148th Street & 1st Ave NE End Termini : Shoreline South/148th Station As of July 22, 2024, the project is in Final Planning status. Anticipated letting year is 2024. WADOT - 148th Street Non-Motorized Bridge (Phase 2) *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Final Planning

Bridges / Tunnels

$29,242,985.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
103
Active Projects
35
Bidding Soon
931
All Active Projects
388
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 1, 2024

img_map_placeholder

N 148th St, Shoreline, WA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.