BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 29, 2024 at 8:00 PM

Updated August 30, 2024

Site work and renovation of a civil project in Shoshoni, Wyoming. Completed plans call for the renovation of a road / highway; for site work for a road / highway; water / sewer project; and water / sewer project.

Project Category Code: Sitework/Excavating and Grading, Fencing/Guardrails/Handrails, Pumps or Pump stations, Demolition/Building Removal/Hauling/Salvage, Removal and Replacement of pipe, Concrete/Formed/Flatwork/Foundation, Wellhead Improvements Description: This project includes the performance of all work as described in teh plans and specifications for the retrofit of three existing municipal well sites located near Shoshoni Wyoming. Question Deadline 08/14/2024 Address questions to: HDR Engineering, Inc. P.O. Box 467 Lander, WY 82520 Attn: Kyle Lehto kyle.lehto@hdrinc.com Phone: (307).228.6063 The Town of Shoshoni has requested the rehabilitation of three of its municipal water well sites. This will include demo and removal of existing well house structures and foundations, repair and additional installation in kind of existing security fencing, installation of level transducers in the wells, installation of pitless adapter units on the well heads, reconnection and routing of yard piping under and up into the structure footprint, construction of concrete strip footing foundations, and furnishment and installation of precast concrete well house structures. Installation of the well house structures will include furnishment of all new water process piping, mechanical/HVAC equipment. One well house will require the additional construction of a 2 hour fire rated partitioned room and the installation of a chlorine gas treatment system therein. The chlorine gas treatment system will require routing and connection of piping for the chlorine feed, as well as plumbing a water line off the piping header to a hot water heater and to an emergency shower and eyewash assembly. The structure housing the chlorine treatment system will require furnishment and installation of alarm safety panels and sensors to be integrated into emergency alarm and shutoff systems. Installation of electrical conduit and installation of smoke, heat, and fire sensing devices for the safety panels shall be the responsibility of the contractor. Power delivery and SCADA integration for all other process equipment and appurtenances will require coordination with the third party SCADA/Electrical Contractor. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Roads / Highways

$909,406.00

Public - City

Renovation, Site Work

10

42

6

4

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
3
Active Projects
1
Bidding Soon
101
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 28, 2024

October 28, 2024

Project location map

Multiple Locations, Shoshoni, WY

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.