Site work and paving for a sidewalk / parking lot in Shoshoni, Wyoming. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Site Directions: Sidewalk is being installed on both sides along 2nd Street from Main Street to 'A' Street in Shoshoni. The project is funded through the Transportation Alternatives Program with Federal Funds administered by WYDOT and local matching funds. The project is the installation of sidewalk for Safe Route corridors and includes approximately 1,750 feet of 4 inch sidewalk, 12 ADA ramps with cast iron truncated domes, and 380 feet of 6 inch driveway; and other related work. Additional Description: Project is federally funded and includes federal requirements. All questions about the meaning or intent of the Bidding Documents are to be submitted to the Engineer in writing. Interpretations or clarifications considered necessary by the Engineer in response to such questions will be issued in writing onto the Quest CDN website at , under the "BIDDER QUESTIONS" section of the website. This section of the website will be updated periodically, and it is the Bidder's responsibility to insure they have the latest available information. Address questions to: HDR Engineering, Inc. 195 S. 5 th St. Lander, WY 82520 Attn: Kyle Lehto kyle.lehto@hdrinc.com Fax: (307) 228.6063 7.02 The Bidder shall notify the Engineer of all conflicts, errors, and/or discrepancies discovered in the Contract Documents a minimum of three (3) days prior to the bid opening. Addenda may be issued to clarify, correct, or change the Bidding Documents, as deemed advisable by the Owner or Engineer. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. Addenda will be issued onto the Quest CDN website at Bidders are required to be registered on the Quest CDN website to receive updates and Addenda. Question Deadline 08/15/2025 Substantial Completion Milestone #1: The south portion of the project will also be substantially completed on or before November 7, 2025. This assumes beginning construction with a Notice to Proceed issued no later than September 29, 2025 with 30 Working Days and a winter shutdown. Substantial Completion Milestone #2: The north portion of the project will also be substantially completed on or before June 26, 2026. This assumes restarting construction with a Notice to Proceed no later than May 18, 2026 with 30 Working Days after a winter shutdown.

Award

Sidewalks / Parking Lot

$466,410.00

Public - City

Paving, Site Work

30

22

11

6

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
3
Active Projects
1
Bidding Soon
101
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 20, 2025

September 29, 2025

Project location map

2nd St, Shoshoni, WY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.