BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 3, 2024 at 8:00 PM

Updated October 4, 2024

Site work and paving for a mixed-use development in Renton, Washington. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The work to be performed under these specifications consists of furnishing all labor, tools, materials, and equipment necessary for construction of the South 7th Street Corridor Improvements. This contract provides for, but is not limited to, signing and striping of bicycle facilities, construction of new sidewalk and paths in unimproved right of way, reconstruction of curbing, gutters and paving at intersections, modification of traffic signal systems, adjustment of damaged utility lids in the roadway, aesthetic landscaping and irrigation, adjustment of stormwater management systems, temporary traffic control, property protection and restoration, and all other Work necessary to complete the Work, all in accordance with the attached Contract Plans, these Contract Provisions, and the Standard Specifications. The estimated cost for this project is $ 2,234,000. Submit questions in writing to Renton City Hall - Transportation Systems, 1055 S Grady Way, Renton, WA 98057, Attn: Keith Woolley, or Submit questions via e-mail to: kwoolley@rentonwa.gov. The subject line should include South 7th Street Corridor Improvements. Project no. V23-109 Any prospective Bidder desiring an explanation or interpretation of the Bid Documents, shall request the explanation or interpretation in writing by the close of business five (5) business days preceding the bid opening to allow a written reply to reach all prospective Bidders before the submission of their Bids. Oral explanations, interpretations, or instructions given by anyone before the Award of Contract will not be binding on the City of Renton.

Post-Bid

Roads / Highways

$2,234,000.00

Public - City

Paving, Site Work

89

17

30

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
66
Active Projects
3
Bidding Soon
1,165
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 2, 2024

December 2, 2024

Project location map

S 7th St, Renton, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.