BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 19, 2024 at 7:00 PM

Updated November 20, 2024

Site work and paving for a civil project in Plevna, Montana. Completed plans call for site work for a road / highway; for paving for a road / highway; and bridge / tunnel.

Contract No. 08B24 The South of Plevna - South project in Fallon County, includes a 1.5-mile scrub seal which begins at the intersection of US HWY 12 followed by a 6.1-mile-long pavement pulverization along State Secondary Route 494 to restore the existing roadway to a gravel secondary. The project starts at the junction with US HWY 12 and extends south to where the pavement currently ends (RP 1.500 to RP 7.600). There are 4 existing 24" metal culverts in poor condition that will be replaced. This project is in Fallon County. Contract to be completed as outlined in the Contract Time special provision found in the proposal. The Disadvantaged Business Enterprises contract goals are 0.00%. This project is under the jurisdiction of the Billings District Administrator. Uniform No. 10277000 MT DOT - Call Order 106 - South of Plevna - South *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Bridges / Tunnels

$897,699.00

Public - State/Provincial

Paving, Site Work

41

5

5

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
3
Active Projects
0
Bidding Soon
33
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 14, 2024

July 7, 2025

Project location map

US-12, Plevna, MT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.