Site work and new construction of a mixed-use development in Wright Patterson AFB, Ohio. Conceptual plans call for the construction of a 12,300-square-foot, one-story above grade laboratory facility; for site work for a laboratory facility; and water / sewer project.

As of February 6, 2025, this project has been cancelled. *The closed solicitation has been included below for reference: DESCRIPTION: The U.S. Army Corps of Engineers (USACE) Louisville District intends to issue a Request for Proposal (RFP) W912QR24B0011 to construct a 12,300 SF single-story, pre-engineered metal building (PEMB), laboratory support building. The building will meet current applicable building codes including Life Safety and Architectural Barriers Act Standards. The laboratory support building will house the research apparatus fabrication laboratory, Technical Research Support space, and associated administrative support function. The construction will involve all systems of a new building such as structural, framing, interiors, plumbing, HVAC, fire safety, electrical, communications, and heavy duty concrete paving to support semi access to the loading dock. The supporting construction of this project includes parking spaces to support the new building, storm drainage, to include stormwater detention pond, sewer, potable water, fire water, electrical, and communication services. The Contract Duration is estimated at three hundred seventy (370) calendar days from Contract Notice to Proceed. The actual Period of Performance will be identified in the solicitation. TYPE OF CONTRACT AND NAICS: This IFB will be for one (1) Firm-Fixed-Price (FFP) contract. The North American Industrial Classification System Code (NAICS) for this effort is 236220 - Commercial and Institutional Building Construction. In accordance with Executive Order 14063, this procurement will require a Project Labor Agreement. Additional details can be found in the solicitation when it is posted. TYPE OF SET-ASIDE: This acquisition will be a Full & Open competitive procurement. SELECTION PROCESS: This is a sealed bid procurement operating under FAR Part 14. The bids will be evaluated using an Invitation For Bid (IFB) source selection process based on the lowest price submitted. CONSTRUCTION MAGNITUDE: The magnitude of this construction project is anticipated to be between $5,000,000 and $10,000,000 in accordance with DFARS 236.204. ANTICIPATED SOLICITATION RELEASE DATE: The Government anticipates releasing the solicitation on or about 6 August 2024 and approximate closing date on or about 5 September 2024. Actual dates and times will be identified in the solicitation. Responses to this synopsis are not required. Additional details can be found in the solicitation when it is posted. PRE-PROPOSAL CONFERENCE: A pre-proposal conference will be held following the issuance of the solicitation. The exact location and time will be included in the solicitation. SOLICITATION WEBSITE: The official solicitation, when posted, will be available free of charge by electronic posting only and may be found at System for Award Management (SAM): Offerors shall have and shall maintain an active registration in the SAM database at http://www.sam.gov to be eligible for a Government contract award. If the Offeror is a Joint Venture (JV), the JV entity shall have valid SAM registration in the SAM database representing the JV as one business/firm/entity. If at the time of award an Offeror is not actively and successfully registered in the SAM database, the Government reserves the right to award to the next prospective Offeror. REGISTRATIONS: Offerors shall have and shall maintain an active registration in the following database: System for Award Management (SAM): Offerors shall have and shall maintain an active registration in the SAM database at http://Sam.gov to be eligible for a Government contract award. If the Offeror is a Joint Venture (JV), the JV entity shall have valid SAM registration in the SAM database representing the JV as one business/firm/entity. If at the time of award an Offeror is not actively and successfully registered in the SAM database, the Government reserves the right to award to the next prospective Offeror. POINT-OF-CONTACT: The point-of-contact for this procurement is Contract Specialist, Lee Merideth, at Ranzel.L.Merideth@usace.army.mil. NOTES: Due to a clerical error, the number of submittal copies required is 1 and not 90. NOTES: Due to a clerical error, the number of submittal copies required is 1 and not 90. The Bid Submission date has shifted to Tuesday, October 10th, 2024. The Projnet link will be reopened for RFIs. DoD Safe shall be used for bid submittals in place of PIEE. Link for DoD Safe should be requested from Ranzel.L.Merideth@usace.army.mil by Sunday October 6th, 2024 at the latest. Link will be distributed to all bidders Monday October 7th, 2024. The Method of Contractor Selection has not been determined at this Time *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Project Abandoned

Laboratories

$10,000,000.00

Public - Federal

New Construction, Site Work

207

42

11

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Construction Progress Documentation, Scheduling of Work, Submittal Procedures, Certificates, Design Data, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Installer Qualifications, Field Samples, Quality Control, Contractor Quality Control, Temporary Facilities and Controls, Temporary Utilities, Construction Facilities, Sanitary Facilities, Vehicular Access and Parking, Traffic Control, Project Identification, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Final Cleaning, Closeout Submittals, Maintenance Data, Bonds, Spare Parts, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing, Concrete Curing, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metals, Common Work Results for Metals, Structural Metal Framing, Structural Steel Framing, Metal Joists, Metal Decking, Steel Decking, Steel Roof Decking, Cold-Formed Metal Framing, Metal Fabrications, Metal Stairs, Metal Ladders, Metal Railings, Metal Gratings, Metal Floor Plates, Formed Metal Fabrications, Column Covers
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment, Finish Carpentry, Architectural Woodwork, Plastic Fabrications, Solid Surfacing Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing, Thermal Protection, Thermal Insulation, Exterior Insulation and Finish Systems, Roofing and Siding Panels, Metal Roof Panels, Metal Wall Panels, Siding, Flashing and Sheet Metal, Sheet Metal Flashing and Trim, Roof and Wall Specialties and Accessories, Roof Specialties, Reglets, Fire and Smoke Protection, Firestopping, Joint Protection, Preformed Joint Seals, Joint Fillers, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Hollow Metal Doors and Frames, Specialty Doors and Frames, Access Doors and Panels, Panel Doors, Entrances and Storefronts, Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Wood Windows, Roof Windows and Skylights, Unit Skylights, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceramic Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Terrazzo Flooring, Carpeting, Wall Finishes, Wall Coverings, Acoustic Treatment, Acoustic Wall Coating, Painting and Coating, Painting, Exterior Painting, Interior Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Directories, Signage, Interior Specialties, Partitions, Wall and Door Protection, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Storage Specialties, Storage Assemblies, Storage Racks, Exterior Specialties, Protective Covers, Other Specialties, Flags and Banners, Flags, Scales
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Loading Dock Equipment, Loading Dock Levelers
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Window Shades, Roller Window Shades, Furnishings and Accessories, Portable Lamps, Lamps, Bedroom Furnishings, Blankets, Rugs and Mats, Entrance Tile, Runners, Furniture, Seating, Chairs, Residential Furniture, Beds, Other Furnishings, Site Furnishings
Division 13 - Special Construction

Division 13 - Special Construction

Special Facility Components, Fountains, Special Purpose Rooms, Special Activity Rooms, Saunas, Special Structures, Fabricated Engineered Structures
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Lifts, Other Conveying Equipment, Facility Chutes
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Facility Storm Drainage, Roof Drains, Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Duct Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, Refrigerant Piping, Refrigerants, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Turning Vanes, Flexible Connectors, HVAC Fans, Air Outlets and Inlets, Central Cooling Equipment, Cooling Towers, Liquid Coolers, Central HVAC Equipment, Evaporative Air-Cooling Equipment, Decentralized HVAC Equipment, Decentralized Unitary HVAC Equipment, Convection Heating and Cooling Units, Radiators, Unit Heaters
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Instrumentation and Control for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Panelboards, Low-Voltage Circuit Protective Devices, Fuses, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Cement and Concrete for Earthwork, Earth Moving, Off-Gassing Mitigation, Radon Mitigation, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Special Foundations, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Pruning, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Paving Specialties, Pavement Markings, Site Improvements, Fences and Gates, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Sodding, Sprigging, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Storm Drainage Utilities, Culverts, Pipe Culverts, Electrical Utilities, Electrical Utility Transmission and Distribution
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists, Hoists, Lifting Devices, Clamps, Hooks, Lifts, Specialty Material Handling Equipment, Metal Detectors, Manufacturing Equipment, Machining Equipment, Drilling Equipment, Material Storage, Storage Equipment and Systems, Storage Racks, Mobile Plant Equipment, Mobile Earth Moving Equipment, Compactors
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
102
Active Projects
64
Bidding Soon
1,373
All Active Projects
577
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 5, 2025

img_map_placeholder

To Be Determined, Wright Patterson AFB, OH

Related To This Project


Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

RFQ Design- WPAFB NAMRU-D Lab Support Building

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.