Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving and new construction of a mixed-use development in Fruitland Park, Florida. Completed plans call for the construction of a 20,144-square-foot, two-story above grade fire / police facility; for site work for a fire / police facility; and for paving for a fire / police facility.
Scorpio is the CM and is soliciting Bids for the Fruitland Park Public Safety Building. The Permit Documents are included in the documents folder. As of August 13, 2024, The A/E team has released Addendum 01 and RFI responses for the Fruitland Park Public Safety Building. The AudioVisual and Electrical scopes of work are the major scopes affected. Please revise all affected proposals by this Thursday, August 15th at 2 PM so that we can incorporate changes into the GMP. The bid date has been extended per addendum 1 from August 9 to August 15, 2024. • Scope of Work is to be completed and turned in with the bid with a "Y" or "N" in each row. The green highlighted cells showing the relevant specification sections are also to be completed with a "Y" or "N". Scope of Work: Concrete, Tilt Wall, Masonry, Steel, Metal Trusses, Casework, Thermal and Moisture Protection, Roofing, Insulation, Doors, Overhead Doors, Glazing, Framing, Ceilings, Flooring, Painting, Specialties, Kitchen Equipment, Lockers and Storage, Window Treatments, Elevator, Fire Protection, Plumbing, HVAC, Electrical, Communications, Security, Sitework, Landscaping. New site construction - Driveways, Parking Lots, Sidewalks, Fencing, Utilities & Storm Drainage System. 1st Floor-Police & Fire Dept. Operations, Apparatus Bay & Sallyport - 14,138 sf 2nd Floor-Police & Fire Dept. Administration & Bunk Room - 6,006 sf New public safety building - 20,144 sf total. Construction type iib with fully automatic sprinkler system. Mixed occupancy business-b, storage-s2 & residential-r2 Although a firm timeline has not been confirmed, construction is not expected to start prior to October 2024.
Post-Bid
Fire / Police
$9,000,000.00
Public - City
New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 15, 2024
October 1, 2024
506 W Berckman St, Fruitland Park, FL
Related To This Project
Fruitland Park, FL
Bid Date: Oct 01 2024
Fruitland Park, FL
--
Fruitland Park, FL
Bid Date: Oct 22 2024
Fruitland Park, FL
Bid Date: Sep 24 2021
Fruitland Park, FL
--
Fruitland Park, FL
Bid Date: Nov 24 2021
Fruitland Park, FL
--
Fruitland Park, FL
Bid Date: Feb 09 2022
Fruitland Park, FL
Bid Date: Oct 03 2023
Fruitland Park, FL
Bid Date: Sep 07 2023
Fruitland Park, FL
Bid Date: Sep 11 2023
Fruitland Park, FL
--
Fruitland Park, FL
--
Fruitland Park, FL
Bid Date: Mar 10 2023
Fruitland Park, FL
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.