EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 24, 2024 at 8:00 PM

Updated October 1, 2024

Site work for a playground / park / athletic field in Yonkers, New York. Completed plans call for site work for a playground / park / athletic field.

Reference Number 0000358359 Conor Park and Playground Improvements, McLean Ave, and Central Park Ave Question Deadline 08/05/2024 at 2:00 PM ET All questions regarding the contents of this bid must be submitted in writing to the Purchasing Contact ALLISON.CORREIA@YONKERSNY.GOV General Requirements - Insurance Required - License Required - Onsite Maintenance Required Award Requirements - All or None Award Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Labor and Materials Bond 100 % The work shall be as shown and called for in the Contract Documents and shall include, but not be limited to, the following general items of work: 1) Remove and dispose of existing playground equipment & fibar mulch, edging, benches, and asphalt pavement. 2) Install new playground equipment. 3) Install new rubber safety surfacing. 4) Install new asphalt pavement. 5) Install new benches. 6) Install new landscaping. 7) Install new storm drainage and piping. 8) Replace existing timber retaining wall. 9) Replace all pavement at basketball - add alternate. 10) Color coat basketball court - add alternate. 11) Install new post & hoop at basketball court - add alternate. The Contractor will be required to mobilize to a location within thirty (30) working days of notification by the City of Yonkers. The Contractor must confirm with the City of Yonkers Engineering Department a minimum of forty-eight (48) hours prior to commencing work at each location in regards to this contract. It is the responsibility of the Contractor to contact and obtain all Code 753 mark-outs for existing utility locations prior to commencing work at all locations. The Contractor is responsible to pursue any damages or delays caused by privately/publicly owned utilities with respective private/public utility companies. The City of Yonkers will NOT become involved with any negotiations between the Contractors and privately/publicly owned utility companies for damages or delays incurred while completing the unit bid items under this contract nor will the City of Yonkers compensate the Contractor for these damages or delays. Site visit 5- Pickett Park and Playground Improvements (230 Hawthorne Avenue (Knowles St and Hawthorne Ave) 6- Buena Vista Park and Playground Improvements (On Buena Vista near Prospect)

Post-Bid

Playgrounds / Parks / Athletic Fields

$400,000.00

Public - City

Site Work

12

10

2

7

Subscribe For Documents

76 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Mockups, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures, Temporary Fencing, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Welded Wire Fabric Reinforcing, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Brick Masonry, Stone Assemblies
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Wall Finishes, Stone Facing
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment, Entertainment Equipment, Play Field Equipment and Structures, Playground Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Multiple Seating, Pews and Benches, Benches
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts, Scaffolding
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Fixtures
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors, Tunneling and Mining
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Common Work Results for Exterior Improvements, Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Storm Drainage Utilities, Culverts
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
555
Active Projects
318
Bidding Soon
5,213
All Active Projects
2,323
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 23, 2024

September 23, 2024

img_map_placeholder

81 Central Park Ave, Yonkers, NY

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Conor Park and Playground Improvements, McLean Ave, and Central Park Ave

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.