BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a mixed-use development in Monterey, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

In general, the work consists of, but is not limited to, demolition and construction of concrete curb ramps, sidewalk, curb and gutter, concrete cross gutter and HMA pavement, in addition to all necessary environmental pollution protection and traffic control requirements... Question Deadline 08/14/2024 at 5:00 PM PT Question Response Deadline:August 16, 2024, 5:00pm At the time of the bid opening, the successful Bidder must be legally entitled to perform contracts requiring a Class 'A' Contractor's license. Any Bidder or contractor not so licensed shall be subject to all penalties imposed by law including, but not limited to, any appropriate disciplinary action by the Contractors' State License Board. All contractor and sub-contractor license(s) must remain in good standing throughout the term of the Contract. The Contractor shall notify the City in writing in the event its license is suspended, expires, or has a change in signatory. An original certified check or cashier's check payable to the order of the City of Monterey, or a satisfactory bid bond executed by the Bidder and an acceptable surety in an amount equal to ten percent (10%) of the bid amount shall be uploaded with each bid, as a guarantee that the bidder, if its bid is accepted, will promptly execute the Agreement. The bid bond must be notarized, include the embossed surety seal, and include a Power of Attorney if the signee is not an officer of the surety. The City reserves the right to reject any or all bids as the best interests of the City may dictate and, to the extent permitted by law, waive any irregularity in any bid. If there is any reason for believing that collusion exists among the bidders, the City may reject any or all bids. SCOPE OF WORK INTENT The work to be done consists of furnishing all labor, materials, methods and processes, implements, tools, equipment, incidentals and machinery except as otherwise specified, which are necessary and required to complete the contract in a satisfactory and workmanlike manner. The intent of the plans and specifications is to prescribe the details for the construction and completion of the work which the Contractor undertakes to perform in accordance with the terms of the contract. Where the plans or specifications describe portions of the work in general terms, but not in complete detail, it is understood that only the best general practice is to prevail and that only materials and workmanship of the best quality are to be used. CHANGES AND EXTRA WORK Changes and extra work shall be in accordance with Section 4-1.05, Changes and Extra Work, of the Standard Specifications. The Engineer reserves the right to make such alterations, deviations, additions to or omissions from the plans and specifications, including the right to increase or decrease the quantity of any item or portion of the work or to omit any items or portion of the work, as may be deemed by the Engineer to be necessary or advisable, and to require such extra work as may be determined by the Engineer to be necessary for the proper completion or construction of the whole work contemplated. When special conditions arise, such as mitigation of unforeseen conditions or additional work, the work shall be negotiated as "extra work" in accordance with the Standard Specifications. Approved Change Orders shall describe the changes or extra work, contract time adjustments and payment basis for such work as applicable. Change Orders are valid contract amendments when approved and signed by the City and Contractor. All changes and extra work must be negotiated and approved before the work is performed. The City may require the Contractor to work outside approved construction hours noted in Part IV, Construction Procedure. For work done during these times, when required by the City, payment to the Contractor may be adjusted per General Prevailing Wage Rate provisions. CLEANUP All work sites shall be kept as clear of equipment, material and waste material as is practicable at all times. The City of Monterey and/or government Representative shall make the determination that this requirement is being complied with. If the City is required to provide cleanup of the work sites due to failure of the Contractor to so provide, or in case of emergency, the City shall charge the Contractor the actual cost of labor and materials and may deduct said costs from any monies due and owing the Contractor. Upon completion and before making application for acceptance of the work, the Contractor shall clean the street and/or other areas of work, and all ground occupied by him in connection with the work, of all rubbish, excess materials, temporary structures, and equipment, and all parts of the work shall be left in a neat and presentable condition.

Award

Roads / Highways

$331,327.00

Public - City

Paving, Site Work

12

8

2

5

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
60
Active Projects
27
Bidding Soon
707
All Active Projects
293
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 20, 2024

September 19, 2024

img_map_placeholder

Multiple Locations, Monterey, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.