BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 29, 2024 at 8:00 PM

Updated August 30, 2024

Site work for a water / sewer project in Fitchburg, Massachusetts. Completed plans call for site work for a water / sewer project.

The installation of approximately 22,000 linear feet of 4- to 16-inch diameter ductile iron water main within the Main Street corridor between the Upper Common/Mechanic Street and North Street. Installation shall be completed via open cut methods, including removal and replacement of existing water main for a portion of the total extent. Work also includes installation of cut-in valves, temporary water main system, water main abandonment, removal of 4- to 16-inch water main, and water service transfer work on Prospect Street. Contractor Qualification Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Bid security in the form of a bid bond, cash, certified check, treasurers or cashiers check payable to the OWNER, is required in the amount of five percent (5%) of the bid, in accordance with the Section The selected contractor shall furnish a performance bond and payment bond in the amount at least equal to one hundred percent (100%) of the contract price as stipulated. Substantial Completion Base Bid 330 calendar days Base Bid plus Bid Alternate No. 1 add 90 calendar days Final Completion Base Bid 460 calendar days Base Bid plus Bid Alternate No. 1 add 50 calendar days The City of Fitchburg reserves the right to waive any informalities or irregularities in the bids received, or to reject any and all bids, wholly or in part.

Bid Results

Water / Sewer

$7,259,662.00

Public - City

Site Work

28

22

4

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
615
Active Projects
240
Bidding Soon
4,590
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 27, 2024

September 26, 2024

Project location map

Main St, Fitchburg, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.