BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Milwaukee, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Construction Of, Variable Thickness Asphaltic Concrete Pavement, Variable Concrete Curb and Gutter, 5" Concrete Walk, Gravel Filling, Concrete Removals, Pavement Marking, Tree Clearing & Grubbing, Etc.; Located At North 20th Street Powerline and Beerline Trail Pedestrian/Bike Improvements (Wisconsin Department of Transportation ID No. 2984-22-75) Time for Completion: All work shall be completed by November 30, 2024 Liquidated Damages, per diem, will be calculated as per Section 108.11 of WisDOT Standard Specifications. The apprenticeship requirements for this project are: N/A The SBE requirement for this project is 0% of the contract base bid. Bid Security Required: Bond, Certified Check, Cashier's Check or Cash to accompany bid: 10% of the Contractor's Base Bid. For those bids being submitted through Bid Express and using a manual Bond, the contractor may send a signed/executed copy of the bid bond to the Department of Public Works Contract Office by emailing DPWbids@milwaukee.gov. General. Perform the work under this construction contract for Project 2984-22-75, 20th St Power Line & Beerline Trail, Olive St - Villard Ave & 20th St -24th St located in the City of Milwaukee, Milwaukee County, Wisconsin as the plans show and execute the work as specified in the State of Wisconsin, Department of Transportation, standard specifications for Highway and Structure Construction, 2024 Edition, as published by the State, and these special provisions. The Contractor and all Subcontractors shall also refer to the City of Milwaukee 'Street Construction Specifications' of the Department of Public Works dated July 1, 1992 and all subsequent addenda, as they shall be held responsible for all requirements listed therein. If all or a portion of the plans and special provisions are developed in the SI metric system and the schedule of prices is developed in the US standard measure system, the City will pay for the work as bid in the US standard system. 2. Scope of Work. The work under this contract shall consist of constructing a 10-foot wide shared use asphalt trail, high visibility crosswalk, curb extensions, median refuges and way finding signs, erosion control, grubbing and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract. 104-005 (20090901)

Bid Results

Roads / Highways

$889,739.00

Public - City

Paving, Site Work

178

7

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
98
Active Projects
50
Bidding Soon
1,054
All Active Projects
456
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 14, 2024

August 29, 2024

img_map_placeholder

Multiple Locations, Milwaukee, WI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.