BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 23, 2024 at 8:00 PM

Updated August 24, 2024

Renovation of a clubhouse / community center in El Cerrito, California. Completed plans call for the renovation of a clubhouse / community center.

Repair and replacement of existing asphalt shingle roof, including, but not limited to, applying for applicable building permits, including payment of permit fees. Providing submittals for products and fabrications for this scope of work. Providing mock ups of penetration and intersection details as requested. Removing all existing roofing materials including underlayment, related flashing, valley flashing, rake flashing, ridge cap, penetration flashing, and intersections with all other roof areas and other building systems. This will include sufficient removal of other systems as required to provide integrated flashing and intersection details for a weathertight replacement scope. Inspection and repair/replacement of limited damaged roof sheathing (assumed to be 5/8" Plywood over rigid insulation), repair or replace in kind. Replacing water resistant underlayment with GAF Tiger Paw consistent with manufacturers recommendations and standards of roofing industry. Replacing galvanized metal flashing systems consistent with manufacturers recommendations and standards of roofing industry. Reinstall adjacent roof systems and other building systems as necessary for a weathertight replacement scope. Replacing roofing consistent with manufacturers recommendations and standards of roofing industry. Ensure compliance with referenced Miami-Dade County Notice of Acceptance (NOA)s for the High Velocity Hurricane Zone of the Florida Building Code. Include ventilated ridge cap and any ventilation systems as necessary to maintain roofing warranty The Engineer's estimate for construction is $325,000 The successful bidder shall be required to furnish a labor and materials bond and a faithful performance bond in the amount of one hundred percent (100%) of the amount of the Contract

Bid Results

Clubhouse / Community Centers

$149,339.00

Public - City

Renovation

5

6

2

4

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
451
Active Projects
196
Bidding Soon
3,240
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 20, 2024

September 19, 2024

Project location map

7007 Moeser Ln, El Cerrito, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.