Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a military facility in Oklahoma City, Oklahoma. Conceptual plans call for the renovation of a military facility.
********************************MARKET SURVEY******************************** - This is not a Screening Information Request or Request for Proposals of any kind; - The FAA is not seeking or accepting unsolicited proposals; - The FAA will not pay for any information received or costs incurred in preparing the response to the market survey; and - Any costs associated with the market survey submittal are solely at the interested vendor's expense. ************************************************************************************* This is a market survey for a construction project titled: Hanger 9 Renovation at the Mike Monroney Aeronautical Center (MMAC), Oklahoma City, OK. Work to be accomplished for the Hanger 9 Renovation includes but not limited to the following: Existing restrooms renovation requirements. Upgrade plumbing fixtures and restroom accessories to meet all applicable building and civil codes and other federal, state, city, and local ordinances and regulations. Reconfigure and modify the water and sanitary systems at all restrooms being renovated and as indicated in the contract documents. Upgrade finishes to meet current FAA finish standards. Replace drinking fountains with filtered bottle filler fountains. Lighting and finishes upgrade requirements. Remove existing exit signs and provide and install new LED exit signs. Remove existing interior non-LED light fixtures and provide and install new interior LED fixtures. Provide and install a new lighting control system. Replace existing ceiling tile and grid in locations with lighting replacement work and in all stairwells. Replace existing carpet tile and wall base in locations with lighting work, wall configuration changes, or where existing is worn or damaged. Patch, repair, and paint existing walls in locations where carpet tile is replaced and in all stairwells. Life safety and accessibility construction requirements. Seal penetrations within the fire barriers separating the hangar high bays from the hangar administration spaces with fire rated sealant or fire stops. Remove and seal abandoned air transfer openings in stairways. Infill resulting openings to maintain wall fire rating Adjust doors on path of egress to meet accessible push/pull clearances where indicated in the contract documents, including changing door swing directions, and enlarging door widths. Replace stair treads at existing stairs where indicated in the contract documents to reduce potential trip hazards. Construct accessible egress ramps at 1st floor exit doors currently lacking accessible means of egress. See contract drawings for locations. Provide and install "NO EXIT" door signs on unmarked doors that could be confused for exit doors. Provide and install emergency exit signage at exterior doors where indicated on the contract drawings. Provide and install additional fire extinguisher and eyewash station signage on existing columns below the netting in the hangar High Bays. Enclose existing ducts that pass-through stairwells in fire rated chases. Modify existing sprinkler system components in areas of renovation to provide complete coverage. Provide and install new sprinkler system components where required. Do not reuse existing sprinklers that were previously removed. Replace all fire alarm notification and initiating devices within Hangar 09 with new devices compatible with the existing fire alarm panel. Mechanical and Plumbing construction requirements. Remove all existing pneumatic combination smoke/fire dampers and their associated control actuators and replace with electronic smoke/fire dampers and electric actuators. Remove existing pneumatic control compressor. Adjust existing diffuser layout to accommodate new lighting layout. Provide and install new return air pathways in areas where existing lights and troffers are replaced with LED lights. Replace drinking fountains with filtered bottle filler fountains. Reconfigure and modify the water and sanitary systems at all restrooms being remodeled as part of the architectural scope. Miscellaneous construction requirements. Repaint all hangar high bay walls, removing and reinstalling bird netting as required. Paint as scheduled in the contract drawings. Repaint and restripe the Hangar 8 High Bay floors to match existing. Remove existing RF shielding walls, floors, and ceilings at Hangar 09 3rd floor east and replace with stud and drywall construction, new ceilings, and flooring. Renovate break room at Hangar 9 3rd floor east located in RF shielded room. Market Survey Response should include the following: 1. Capability Statement - This document should identify: - Type of services provided by firm, - Size and type of services provided on previous government/private sector contracts - Number of years in business - Small Business Size Status to include applicable socio-economic information such as 8(a), WOSB, SDVSB, etc. 2. Detailed information (Agency or Customer/Dollar Amount/Scope/etc.) regarding past projects respondent has completed with similar work to work identified in this Market Survey. Respondents must be active in the System for Award Management (SAM) (www.sam.gov). All responses to this market survey must be received by Thursday, August 16th, 2024, 4:00 p.m. CT. All submittals must be submitted by email to: andre.casiano@faa.gov. The responses to this market survey will be used for informational and procurement planning purposes only. This is not a screening information request or request for proposal of any kind. The FAA is not seeking or accepting proposals at this time. The FAA will not pay for any information received or costs incurred in preparing the response to the market survey. Therefore, any cost associated with the market survey submission is solely at the interested vendor's expense. The Method of Contractor Selection has not been determined at this Time.
Conceptual
Military
$500,000.00
Public - Federal
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 18, 2025
6500 S MacArthur Blvd, Oklahoma City, OK
Related To This Project
Oklahoma City, OK
Bid Date: Aug 21 2024
Oklahoma City, OK
Bid Date: Aug 21 2024
Oklahoma City, OK
Bid Date: Aug 21 2024
Oklahoma City, OK
Bid Date: Aug 28 2024
Oklahoma City, OK
Bid Date: Aug 09 2024
Oklahoma City, OK
Bid Date: Aug 01 2024
Oklahoma City, OK
Bid Date: Aug 07 2024
Oklahoma City, OK
Bid Date: Aug 28 2024
Oklahoma City, OK
Bid Date: Aug 21 2024
Oklahoma City, OK
--
Oklahoma City, OK
Bid Date: Aug 14 2024
Oklahoma City, OK
Bid Date: Aug 13 2024
Oklahoma City, OK
--
Oklahoma City, OK
Bid Date: Sep 12 2024
Oklahoma City, OK
Bid Date: Aug 14 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.