BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a military facility in Oklahoma City, Oklahoma. Conceptual plans call for the renovation of a military facility.

********************************MARKET SURVEY******************************** - This is not a Screening Information Request or Request for Proposals of any kind; - The FAA is not seeking or accepting unsolicited proposals; - The FAA will not pay for any information received or costs incurred in preparing the response to the market survey; and - Any costs associated with the market survey submittal are solely at the interested vendor's expense. ************************************************************************************* This is a market survey for a construction project titled: Hanger 9 Renovation at the Mike Monroney Aeronautical Center (MMAC), Oklahoma City, OK. Work to be accomplished for the Hanger 9 Renovation includes but not limited to the following: Existing restrooms renovation requirements. Upgrade plumbing fixtures and restroom accessories to meet all applicable building and civil codes and other federal, state, city, and local ordinances and regulations. Reconfigure and modify the water and sanitary systems at all restrooms being renovated and as indicated in the contract documents. Upgrade finishes to meet current FAA finish standards. Replace drinking fountains with filtered bottle filler fountains. Lighting and finishes upgrade requirements. Remove existing exit signs and provide and install new LED exit signs. Remove existing interior non-LED light fixtures and provide and install new interior LED fixtures. Provide and install a new lighting control system. Replace existing ceiling tile and grid in locations with lighting replacement work and in all stairwells. Replace existing carpet tile and wall base in locations with lighting work, wall configuration changes, or where existing is worn or damaged. Patch, repair, and paint existing walls in locations where carpet tile is replaced and in all stairwells. Life safety and accessibility construction requirements. Seal penetrations within the fire barriers separating the hangar high bays from the hangar administration spaces with fire rated sealant or fire stops. Remove and seal abandoned air transfer openings in stairways. Infill resulting openings to maintain wall fire rating Adjust doors on path of egress to meet accessible push/pull clearances where indicated in the contract documents, including changing door swing directions, and enlarging door widths. Replace stair treads at existing stairs where indicated in the contract documents to reduce potential trip hazards. Construct accessible egress ramps at 1st floor exit doors currently lacking accessible means of egress. See contract drawings for locations. Provide and install "NO EXIT" door signs on unmarked doors that could be confused for exit doors. Provide and install emergency exit signage at exterior doors where indicated on the contract drawings. Provide and install additional fire extinguisher and eyewash station signage on existing columns below the netting in the hangar High Bays. Enclose existing ducts that pass-through stairwells in fire rated chases. Modify existing sprinkler system components in areas of renovation to provide complete coverage. Provide and install new sprinkler system components where required. Do not reuse existing sprinklers that were previously removed. Replace all fire alarm notification and initiating devices within Hangar 09 with new devices compatible with the existing fire alarm panel. Mechanical and Plumbing construction requirements. Remove all existing pneumatic combination smoke/fire dampers and their associated control actuators and replace with electronic smoke/fire dampers and electric actuators. Remove existing pneumatic control compressor. Adjust existing diffuser layout to accommodate new lighting layout. Provide and install new return air pathways in areas where existing lights and troffers are replaced with LED lights. Replace drinking fountains with filtered bottle filler fountains. Reconfigure and modify the water and sanitary systems at all restrooms being remodeled as part of the architectural scope. Miscellaneous construction requirements. Repaint all hangar high bay walls, removing and reinstalling bird netting as required. Paint as scheduled in the contract drawings. Repaint and restripe the Hangar 8 High Bay floors to match existing. Remove existing RF shielding walls, floors, and ceilings at Hangar 09 3rd floor east and replace with stud and drywall construction, new ceilings, and flooring. Renovate break room at Hangar 9 3rd floor east located in RF shielded room. Market Survey Response should include the following: 1. Capability Statement - This document should identify: - Type of services provided by firm, - Size and type of services provided on previous government/private sector contracts - Number of years in business - Small Business Size Status to include applicable socio-economic information such as 8(a), WOSB, SDVSB, etc. 2. Detailed information (Agency or Customer/Dollar Amount/Scope/etc.) regarding past projects respondent has completed with similar work to work identified in this Market Survey. Respondents must be active in the System for Award Management (SAM) (www.sam.gov). All responses to this market survey must be received by Thursday, August 16th, 2024, 4:00 p.m. CT. All submittals must be submitted by email to: andre.casiano@faa.gov. The responses to this market survey will be used for informational and procurement planning purposes only. This is not a screening information request or request for proposal of any kind. The FAA is not seeking or accepting proposals at this time. The FAA will not pay for any information received or costs incurred in preparing the response to the market survey. Therefore, any cost associated with the market survey submission is solely at the interested vendor's expense. The Method of Contractor Selection has not been determined at this Time.

Conceptual

Military

$500,000.00

Public - Federal

Renovation

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
29
Bidding Soon
429
All Active Projects
211
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 18, 2025

img_map_placeholder

6500 S MacArthur Blvd, Oklahoma City, OK

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.