BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a power facility in Doral, Florida. Completed plans call for the construction of a power facility; and for site work for a power facility.

Scope of Work: (Contractor must obtain and submit all permits prior to performing any work.) The scope of work consists of New Surface Parking Lot located at 9601 NW 58 Street, Doral, FL 33178. The bidder shall examine the site carefully to determine the scope of work and satisfy him/herself as to all observable conditions. Any questions regarding materials or obstacles that might be expected must be clarified during the bidding period. Work includes, but is not limited to, furnishing all materials, labor, services, supervision, tools, equipment, permits, and all other items necessary to complete the entire scope of work included in all construction documents and specifications. The bid price is also to include any asbestos survey and abatement (if applicable), all related permit fees and permitting expenses related therewith. All work is to be performed in accordance with the latest edition of the Florida Building Code (FBC) and all local, state, and federal regulations and NEW SURFACE PARKING LOT FOR MIAMI DADE PUBLIC TRAINING INSTITUTE construction documents and specifications. The bid price shall include the removal and proper off-site disposal of all work-related debris. All required permits m ust be obtained by awarded contractor within 30 days of award. This is a high security facility where all employees need to provide a driver's license or other form of identification and will be subject to a background check prior to being granted access to site. Prospective bidders or key personnel must show experience in two (2) projects high security environments in the last five (5) years and at least two (2) projects of similar size and scope. The work must be carried out in a manner that will not disturb the daily business operations of the building patrons. All work must be carried out during the hours of 7:00 am and before 5:00 pm. Any work to be performed outside of these hours must be coordinated and pre-approved by the County Project Manager. The Contractor must provide, at least 48 hours' notice prior to any work performed outside of the specified time frame. All work performed outside of the aforementioned working hours must be for the benefit of the Contractor. The County will not be responsible for paying any additional compensation for working outside the aforementioned working hours. Commercial All RFI Shall Be Submitted by 2:00 Pm, Friday, August 30, 2024. Contact: Maggie Acosta, Phone No: 305-471-2520 Estimated value: $1,100,000 Performance and payment bond required : Yes Bid bond required : Yes Liquidated damages : yes $$ per day : $150.00 Anticipated start date : 9/29/2024 Calendar days to project Completion : 180 Project no -EDP-PD2020AE, 19-071

Post-Bid

Solar Power Generation

$1,100,000.00

Public - County

New Construction, Site Work

20

4

4

3

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
262
Active Projects
133
Bidding Soon
1,848
All Active Projects
782
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 11, 2024

September 29, 2024

March 28, 2025

img_map_placeholder

9601 NW 58th St, Doral, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.