BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 21, 2024 at 8:00 PM

Updated August 22, 2024

Site work and paving for a road / highway in Ringle, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The overall description of the project, to be completed under one contract, is the pulverizing and repaving of approximately 4,000 feet of a rural street section. The project begins at Duncun Road Lane and extends for approximately 4,000 feet eastward, near Nazda Road. The project includes pulverizing the existing approximately 3-inch asphalt pavement, grading, compaction, asphaltic paving. and shouldering. The approximate units of the major work items are as follows, 1) Pulverize Asphalt yards 9,500 square 2) Furnish and Install Asphalt Binder and Wear Surfaces 1,600 tons 3) Shouldering-300 cubic yards Bids shall be submitted with a minimum 5% Bid Bond. The Town of Ringle reserves the right to reject any or all bids, to waive any informality in the bidding, and to award the Contract in the best interest of the Town. No bid shall be withdrawn for a period of 60 days after the actual time of opening the bids. A performance Bond and a Payment Bond, each in the amount of 100 percent (100%) of the total bid price, together with an executed Agreement in the form prescribed by the Town, will be required of the successful bidder. Copies of the Contract Documents may be obtained from the office of Marathon Technical Services LLC, located at 1699 Schofield Ave Suite 115, Schofield, WI 54476 or from nick@mtsllc.net. Scope of Work This work shall consist of the placement of a plant mixed asphaltic concrete surface or pavement on the prepared subgrade in accordance with the specifications and contract and in conformity with the lines, grades and typical sections shown on the plans. Perform asphaltic paving Work in accordance with WDOT Standard Specifications for Highway and Structure Construction 2019 Edition Section 460. The batch plant mixing shall conform to WDOT Standard Specifications for Highway and Structure Construction 2019 Edition. Perform pavement marking in accordance with WDOT Standard Specifications Section 646.

Award

Roads / Highways

$181,941.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

11

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
99
Active Projects
22
Bidding Soon
518
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 8, 2024

September 9, 2024

Project location map

Poplar Ln, Ringle, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.