Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a service station / car wash facility in Doral, Florida. Completed plans call for site work for a service station / car wash facility.
HQ Electric Vehicle Charging Stations Phase 2, Estimated Cost: $300,000.00 License Requirement: Electrical Contractor. Scope Of Work: Contractor To Furnish The Necessary Permits, Materials, Equipment And Labor To Accomplish The Following: This Project Entails The Installation Of Nine (9) Plug-in Electric Vehicle Pedestal Charging Stations At The Miami-dade Fire Rescue Headquarters. The Work Must Adhere To The Plans Approved By The Miami-dade County Building Department. The Contractor Is Responsible For Submitting All Electrical Equipment, Overcurrent Protection, Disconnects, Conduits, And Other Necessary Items For Approval. The Contractor(S) Must Also Provide The Required Permits, Equipment, Materials, And Labor To Complete The Following Tasks: 1. The Contractor Is Obligated To Replace Any Sod And/or Vegetation Damaged Due To The Project. The Existing Hedges Shall Be Removed And Substituted With Sod. The Replacement Sod Must Be Installed Level With The Existing Sod. Clean Soil Shall Be Utilized For Backfilling Purposes. 2. The Contractor Shall Reinstall All Asphalt Removed Due To The Project With A Minimum Of 1 Inch Of Asphalt. The New Asphalt Shall Match The Existing Pavement. 3. The Backfill Material Shall Consist Of Loose Soil. No Rocks With An Approximate Diameter Of 5 Inches Or Greater Shall Be Utilized. 4. Trenching Shall Have Backfill Compacted Prior To Placing Any Asphalt. 5. Parking Signs And Signposts Shall Be Provided And Installed At The Head Of Each Parking Space Designated For Vehicles. Refer To The Drawing Details For Specific Installation Requirements. Prior To Installation, The Contractor Must Contact The Mdfr Project Manager To Confirm The Exact Locations. 6. Chargepoint@ Charging Stations Shall Be Provided By And Installed By Awarded Contractor. Contractor Will Be Responsible To Communicate With Manufacturer On Equipment Details And Obtain Any And Every Document Associated With The Installation Of The Pedestal Equipment. 7. Upon Receiving Final Electrical Inspection Approval From The Building Department, The Contractor Shall Promptly Notify The Mdfr Project Manager. Subsequently, Mdfr Will Coordinate The Activation Of Charging Stations With The Manufacturer. The Contractor Must Remain Available In Case Coordination Is Required During The Activation Process. 8. Permits And Inspections Are The Sole Responsibility Of The Awarded Contractor. The Plans And Permits Have Already Received Approval From The Miami-dade Building Department. Therefore, The Awarded Contractor Must Submit A Change Of Contractor Application, And Any Fees Associated With The Change Of Contractor Shall Be The Responsibility Of The Contractor. 9. Contractor Shall Keep Work Areas Clean From Debris And Safe At The End Of Each Workday. Disposal Of Debris Will Be At Contractor's Expense. County Dumpsters Onsite Will Not Be Used For This Purpose. 10. Work Hours Are Monday Through Saturday 7am To 5pm. 11. Mdfr Project Manager Must Be Notified Of Any Equipment Or Material Staging And/or Delivery 48 Hours Prior To Arrival. The Last Day For Project Rfi Questions Is Close Of Business On Thursday, August 22, 2024. Any Questions Submitted After Aforementioned Date Shall Not Be Considered. Mdfr Will Review And Answer The Questions, Prior To The Bid Due Date.
Bid Results
Service Station / Car Wash
$173,300.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 29, 2024
September 30, 2024
9300 NW 41st St, Doral, FL
Related To This Project
Doral, FL
Bid Date: Sep 11 2024
Doral, FL
Bid Date: Aug 27 2024
Doral, FL
Bid Date: Aug 09 2024
Doral, FL
Bid Date: May 02 2018
Doral, FL
Bid Date: Dec 05 2024
Doral, FL
Bid Date: Sep 18 2024
Doral, FL
--
Doral, FL
Bid Date: Sep 11 2024
Doral, FL
Bid Date: Oct 23 2024
Doral, FL
Bid Date: Dec 04 2024
Doral, FL
Bid Date: Jul 17 2024
Doral, FL
--
Doral, FL
Bid Date: Aug 06 2024
Doral, FL
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.