BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 6, 2025 at 7:00 PM

Updated November 7, 2025

Site work for a water / sewer project in Trenton, New Jersey. Completed plans call for site work for a water / sewer project.

For Engineering Services for Design, Bidding, and Construction Supervision of a Water Main and Ancillary Structure to Connect Klockner Booster Zone With Booster 3 Zone, Hopewell Township, Nj for a Period of Thirty (30) Months Proposers Questions: October 16, 2025, to igarcia@trentonnj.org If required, an addendum will be issued and posted on the website by OCTOBER 21, 2025. Engineering Design completion by February 2028, and Construction completion by December 2031 The City of Trenton Department of Water and Sewer, Trenton Water Works (TWW), requests proposals from qualified companies (the "Firm" or "Firms") to provide services related to the design and construction of improvements to the Klockner Pump station and the Booster 3 and Klockner Zone. This project is a critical component of TWW's infrastructure upgrades and Pennington Reservoir Replacement Plan (PRRP), aimed at improving system resiliency, operational efficiency, and compliance. The PRRP was initiated because TWW is subject to a February 2018 Administrative Consent Order (ACO) requiring TWW to address purported non-compliance with federal Cryptosporidium treatment standards, linked to the operation of the uncovered Pennington Reservoir. Following extensive evaluation of potential alternatives, TWW determined that constructing a network of decentralized water storage tanks and completely replacing the Pennington Reservoir is the preferred approach. Within this overall strategy, the existing Klockner Pump station requires major upgrades. With the primary goal being to replace the existing pumps and increase the capacity of the Klockner Pump Station to service the growing area. The Booster 3 Zone and Klockner Zone are also in need of hydraulic analysis and distribution system upgrades. The goal of this project is to identify using modeling, a construction project, or multiple construction projects to build sufficient interconnections between the two pressure zones so they can efficiently and reliably function as one. Once these projects are identified, they must also be integrated with the improvements needed to the Klockner Pump Station, increasing the capacity and operational resilience of that pump station.

Post-Bid

Water / Sewer

$564,286.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
976
Active Projects
520
Bidding Soon
7,255
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 5, 2025

December 5, 2025

Project location map

Multiple Locations, Trenton, NJ

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.