BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Cut Off, Louisiana. Contact the soliciting agency for additional information.

RFQ notes: Submittals can be hand delivered or mailed to 16829 East Main Street, Cut Off, LA 70345, or submitted online . The Port Commission requests three (3) bound, printed copies if sending hard copies. Electronic copies sent via email will not be accepted. All submittals received after the above specified time will not be considered. Statements of Qualifications must be submitted on a Standard Form 330 (SF 330), which may be obtained from the Port Commission or from the LADOTD Aviation Section. The scope of services is to provide professional Airport On-Call Planning Consultant Services to the Port Commission, furnishing all services required to assist in the development and management of financing, planning, and design of its general airport development. Services may include the following: Assistance in the administration of the Airport's Capital Program, Coordination with Design Consultants, Contractors, and Governmental Agencies, Management and administration of the Airport's DBE Program, Provision of Program Implementation Services, Preparation of Independent Fee Analysis, Preparation of General Planning and Environmental Documents, Preparation of Benefit Cost Analysis, Airport Operational Planning, Coordination and Assistance in updates to the ALP and eALP, Airport Rates and Charges, Preparation of Airport Master Plan update and FAA AGIS survey, Updates to Airport Operations Manual-minimum standards and rules & regulations, Updates to Airport Emergency Plan, Wildlife Mitigation, Obstruction/ Hazard Mitigation, Compatible Land Use Study, and Pavement Maintenance. The scope of projects for implementation under this planning contract may include the following: Continuation of Airport Terminal Development, Airfield Lighting System Upgrades, Airfield Pavement Strengthening, including Runways, Taxiways and Aprons, Taxiway and Apron Pavement Rehabilitation, Airfield Markings, Runway and Taxiway Extension, Airfield Drainage Improvements, Construction of New Aircraft Hangar Facilities, Airport Perimeter Fencing, Airfield Electrical Vault Improvements, Construction of New Airport Traffic Control Tower/ Remote Tower, Airport Fuel System Upgrades, Lightning Detection System, Runway Safety Area, Instrument Landing System, and International Arrival Facility. Firms interested in performing these services shall furnish statement of qualifications on a Standard Form 330 (SF 330). Only the prime (lead) firm must fill out the SF 330 and list any Subconsultants. Criteria and weighting factors will be used by the Port Commission's selection committee in evaluating proposals. The Port Commission reserves the right to reject all applicants and re-advertise the contract. Following the successful negotiation of fees with the Port Commission, the successful firm will be required to execute the standard LADOTD Aviation Section contract and have an active Dun & Bradstreet (DUNS) number through ONLINE The Port Commission, in accordance with Title VI of the Civil Rights Act of 1964, 42 U.S.C. Section 2000 d et. seq. and 49 CFR Part 26 issued pursuant to The Airport and Airway Development Act, affords Disadvantaged Business Enterprises (DBEs) full opportunity to submit an indication of interest in response to this invitation and will not discriminate against any interested firm on the ground of race, creed, color, sex, age, or national origin in a contract award. Questions regarding this project should be addressed to Serena Bruce via telephone at (985) 632-6701 or via email at glpc@portfourchon.com. Firms wishing to apply must submit a fully completed SF 330 along with your proposal. Failure to provide all the information requested may result in the submission being considered non-responsive and the firm will not be given a total score in the evaluation process. The method of Contractor Selection has not been Determined at this time

Conceptual

Transportation Terminals

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
74
Active Projects
45
Bidding Soon
453
All Active Projects
204
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 21, 2025

img_map_placeholder

Multiple Locations, Cut Off, LA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.