BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 6, 2024 at 8:00 PM

Updated August 17, 2024

Site work and new construction of an office development in New Bern, North Carolina. Completed plans call civil work for an office development.

Located at the National Forests of North Carolina Croatan District in New Bern, North Carolina. Work consists of site preparation, private access roads construction, utilities construction, construction of 6,600 square foot Ranger Station, fencing, and construction of two helipads. Site Visit will be held on 7-23-24 at 9am. All Questions will be due via email on 7-25-24 by 1pm via email to penny.zortman@usda.gov Site visit is NOT mandatory & Contractors can visit the project site on their own at any time The following summarizes the main findings of the exploration, particularly those that may have a cost impact on the planned development. Further, our principal foundation recommendations are summarized. Information gleaned from the executive summary should not be utilized in lieu of reading the geotechnical report. The geotechnical exploration performed for the site included two (2) electronic cone penetration test (CPT) soundings drilled to termination depths ranging from approximately 35 to 45 feet. Three (3) Kessler dynamic cone penetrometer (DCP) tests with hand auger borings were performed in the proposed pavements. The proposed structure can be supported on a deep foundation system consisting of 8-inch round tip timber piles embedded to depths of 36 feet beneath existing grades for an axial capacity of 18 kips. Alternative embedment depths and their respective capacities are listed in section 4.1 of this report. Groundwater was encountered in the soundings and borings at depths ranging from approximately 3.25 to 3.67 feet below existing grade. Groundwater was not encountered in hand auger borings K-1 and K-3 at the depths explored. Due to the near-surface soft CLAY (CL) encountered in the hand auger borings, ECS recommends undercutting to depths of 2 feet beneath existing grades and backfilling with approved structural fill prior to the construction of pavements and placement of fill.

Post-Bid

Office

$1,000,000.00

Public - Federal

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

39

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
88
Active Projects
44
Bidding Soon
608
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 16, 2024

October 15, 2024

Project location map

141 E Fisher Ave, New Bern, NC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.