BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 23, 2024 at 8:00 PM

Updated September 21, 2026

Site work for a power facility in Old Harbor, Alaska. Completed plans call for site work for a power facility.

Hydro Electric Dam Project Old Harbor, AK The Alutiiq Tribe of Old Harbor (ATOH), in partnership with the Alaska Native Tribal Health Consortium (ANTHC) is soliciting proposals from progressive design build teams for the design and construction of a hydroelectric dam project. This dam and its associated appurtenances would provide enough clean and sustainable power to displace up to 95% of the diesel fuel required by the community of Old Harbor on the south portion of Kodiak Island, Alaska for the next 50 years. The goal of this project is to provide electricity to the community of Old Harbor using hydroelectric baseload for a majority of the year and supplement with diesel from the Alaska Village Electrical Cooperative's (AVEC) power plant as necessary. ANTHC has elected to pursue the progressive design build (PDB) delivery method for the project. The Scope of Work included with this solicitation (Form 00 24 13) provides a general overview of the project scope and indicative design criteria. The PBD criteria only requires the potential contractor provide a hard cost for the first phase of the project, which is 65% design completion including appropriate geotechnical boring and portion of permitting work and FERC article compliance. This project is subject to the Build America, Buy America Act (BABAA) requirements under Title IX of the Infrastructure Investment and Jobs Act (IIJA), Pub. L. 117-58 70901-70953. Absent an approved waiver, all iron, steel, manufactured products, and construction materials used in this project must be produced in the United States. A non-mandatory pre-proposal conference for the Project will be held on Tuesday, 6 August 2024 at 10:00am. See RFP Article 4 for details. TECHNICAL PROPOSAL DUE: 10AM ALASKA TIME, THURSDAY, 29 AUGUST 2024 Anticipated Magnitude of Construction: $10,000,000 to $15,000,000 ANNIE MESSER, CPSM, C.P.M. DIVISION OF ENVIRONMENT HEALTH & ENGINEERING CONTRACTS OFFICER III 4500 DIPLOMACY DRIVE, SUITE 340 ANCHORAGE, AK 99508 907.729.4063 amesser@anthc.org Questions deadline: 8/20/24 at 11:30 AM All questions about the meaning or intent of the Proposal Documents are to be directed to Owner in writing. Interpretations or clarifications considered necessary by Owner in response to such questions will be issued by Addenda mailed or delivered to all parties recorded by Owner as having received the Proposal Documents. Questions received less than ten days prior to the date for opening of Proposals may not be answered. Only questions answered by formal written Addenda will be binding. Or This criterion assesses how well the proposer understands the scope of the project and ANTHC's goals and objectives. Proposers will be evaluated on their proposed approach to deliver the project through design and construction and how the approach meets the ANTHC's objectives. ANTHC is particularly interested in how the approach contributes to meeting the objectives outlined below (detailed description can be read in the RFP Article 3 - Progressive Design-Build Services) individually while not sacrificing meeting one objective in order to meet another.

Award

Hydroelectric Power Generation

$15,000,000.00

Public - Federal

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

13

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1
Active Projects
0
Bidding Soon
9
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 12, 2024

April 1, 2026

Project location map

Multiple Locations, Old Harbor, AK


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.