BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Anchorage, Alaska. Contact the soliciting agency for additional information.

Alaska Aerospace Corporation (AAC) has a requirement to assist in Hazardous Waste Removal from the PSCA facility in Kodiak, AK. AAC anticipates the following task to be the bulk of the work. 1.Waste identification and profiling ~ Safety Data Sheets (SDSs) will be collected from all identifiedproducts, and waste acceptance vendors will be determined by waste acceptance criteria. Please seeAttachment 1~ PSCA HAZ Waste Inventory for current information. 2.Chemistry Requests ~ as required by vendors accepting waste. 3.Segregation and Prepare for Shipment ~ After disposal vendors have approved the profiles andissued profile paperwork, separation and loading the onsite container van. Currently one van sits atthe spaceport available to be loaded with waste. 4.Shipping ~ Coordinate shipping with Samson and communicate expected ship times with allstakeholders. 5.Certificate of Disposal ~ Provide copies of disposal acceptance facilities (TSDF) receipt of good or acertificate of disposal. 6.Implement the Waste Management Plan provided by AAC~ Establish a suitable WasteAccumulation Area where all hazardous waste generated on-site would be sorted, processed, and shipped. Contractor would make once monthly visits to manage accumulated waste for a period of three months and ensure that the established waste management system is compliant with state and federal regulations. Once systems are established and an AAC representative is trained, AAC will take over the management process. PERIOD OF PERFORMANCE: BEGIN: 01 AUG 2024 END: December 31, 2024 Each offeror has the responsibility to disclose to the Contracting Officer, prior to award, all facts relevant to the existence or potential existence of organizational conflicts of interest. The Chief Executive Officer (CEO) of Alaska Aerospace reserves the right to consider a proposal non-responsive or cancel the award if any interest disclosed from any source could give the appearance of a conflict. The CEO's determination regarding any questions of conflict of interest shall be final.

Post-Bid

Municipal

Public - Federal

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
7
Active Projects
1
Bidding Soon
128
All Active Projects
44
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 9, 2024

September 2, 2024

img_map_placeholder

To Be Determined, Anchorage, AK

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.