BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 21, 2024 at 8:00 PM

Updated September 22, 2024

Renovation of a military facility in Anchorage, Alaska. Completed plans call for the renovation of a military facility.

21 Aug 2024 ** Extended Response time/ offers due - Extended date offers due to 27 August 2024 "2:00 PM AKDT" ** 19 Aug 2024 ** Corrected time zone offers due - Extended date offers due to read "2:00 PM AKDT", 21 Aug 2024 and not "2:00 PM EST"** 16 Aug 2024 ** - Added Attachment X_Questions _ Answers 0003 - Added Attachment VIII_JBER Telecom Criteria Requirements - Added Attachment IX_OSP JBER Telecom Standards - 12 April 2023 ** 14 Aug 2024 ** - Added Attachment V Questions _ Answers 0002 - Added Attachment VI_AK20240001_BH_07192024 - Added Attachment VII_SCA_WD_2015-5681_07222024 _______________________________________________________________ ** 13 Aug 2024 ** - Added Attachment IV Questions _ Answers 0001 - Updated Attachment I - 55WG PWS para 3.0 to read "15 Days After Receipt of Order - JBER" _______________________________________________________________ Install Fiber Optic cabling from Hangar 3 (Bldg. 10571) Communication Room to MCLIPS shelters. This effort is to install 24 strands of fiber optic cabling from the first floor comm room (Room 102B) to the interior of the MCLIPS Shelters. Engineer, Furnish, Install, and Test (EFI&T) 24 strand single mode fiber optic communication cable from first floor comm room (Room 102b) to MCLIPS shelters on north side of Hangar 3. Contractor must provide and terminate approximately 300 ft of fiber into a 24-port small form factor fiber patch panel in hangar 3 comm room 102b. The distant end of the fiber will be terminated in a 24-port small form factor patch panel in the MCLIPS shelter. All Connectors will be LC format. Materials, installation, and testing will comply with industry standards outlined in OSP JBER Telecom Standards and JBER Telecom Criteria (attached). Exterior fiber needs to be installed within a rigid metal conduit approximately 250ft and must be firmly affixed to the exterior of Hangar 3 and the exterior of the MCLIP shelter. Question Deadline 08/15/2024 at 2:00 PM AKT Any questions shall be directed to the POCs listed above IN WRITING to the email addresses jason.topick.1us.af.mil

Award

Military

$18,480.00

Public - Federal

Renovation

11

9

2

4

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
12
Active Projects
2
Bidding Soon
141
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 27, 2024

September 26, 2024

Project location map

Multiple Locations, Anchorage, AK


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.