BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a bridge / tunnel in Chetek, Wisconsin. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

As of September 27, 2024, this project has not yet been awarded. A timeline for the award has not yet been established. In general, the project consists of reconstruction of approximately 0.038 miles of Pokegama Trail #2. The project includes removing the existing structure, grading, topsoil, seeding, riprap, temporary structure, and furnishing and installing prefabricated steel truss snowmobile bridge, and all incidental items necessary to complete the work. A single prime bid will be received for the work. Bids must be accompanied by bid security in the amount of 10% of the maximum bid amount. Bid and bid security may not be withdrawn for a period of time as specified in the Wis. Dept. of Transportation Standard Specifications. Bid security will be retained if the Bidder is awarded the Work and fails to execute the Contract and furnish 100% Performance and Payment Bonds. This project is receiving funding under a WDNR Motorized Trail Aid Grant. Bidders shall be experienced in this type of work and be prequalified with the Wis. Dept. of Transportation for work in the class and amount of their bid, or shall complete the Statement of Bidder's Qualifications bound with the proposal. The Statement of Bidder's Qualifications, if completed, shall be returned with the proposal. Owner reserves the right to reject any or all bids and to waive informalities in any bid. Est. Completion Date: March 31, 2025

Bid Results

Bridges / Tunnels

$644,621.00

Public - County

Demolition, New Construction, Paving, Site Work

31

8

6

6

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
52
Active Projects
29
Bidding Soon
473
All Active Projects
180
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 15, 2024

September 16, 2024

img_map_placeholder

Pokegama Trail, Chetek, WI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.