BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in West Valley City, Utah. Completed plans call for site work for a water / sewer project.

Provide sanitary sewer manhole rehabilitation services that include, but are not limited to, cleaning and preparing surfaces of manholes and the application of epoxy liner systems. The work generally includes, but is not limited to providing rehabilitation of existing sanitary sewer manholes by applying an epoxy liner per manufacturer's specifications. The work also consists of furnishing and installing the equipment, facilities, services, and appurtenances as indicated in the plans and specifications. A. Bidders are invited to bid on Construction Contract known as Granger-Hunter Improvement District, 24H: Manhole Rehabilitation Project. B. The location of the work is: Various locations indicated on the Drawings. C. The work to be performed consists of furnishing and installing the equipment, facilities, services and appurtenances thereto as included in the Contract Documents. The Work generally includes, but is not limited to, the following: 1. Obtaining all necessary permits. 2. Project supervision. 3. Mobilization/Demobilization. 4. Bypass pumping as required. 5. Remove existing liner and replace with epoxy. 6. Epoxy line manholes. 7. Grout and seal damaged manhole structures and epoxy line. 8. Underlayment repair and epoxy line. 9. Replace cone if necessary. D. For information about the award of this Construction Contract, contact: Granger-Hunter Improvement District 2888 South 3600 West West Valley City, Utah 84119 Attention: Zak Bedard, Engineering Project Manager Telephone: 801-955-2202 The Owner reserves the right to reject any or all bids and to determine which bid is, in the Owner's judgment, the lowest responsive responsible bid of a bidder or group of bidders. The Owner also reserves the right to waive any informality in any bid and to delete certain items listed in the bid as set forth therein. A. Bid security in the amount of five percent (5-percent) of the Bid must accompany each Bid in accordance with the Instructions to Bidders. Bid Security will be returned to each unsuccessful Bidder after tabulation and award of the Construction Contract. The successful bidder will be required to furnish performance and payment bonds, each in an amount not less than one hundred percent (100-percent) of the contract price. 1.4 PRE-BID CONFERENCE A. A pre-bid conference will not be held. The Work will be Substantially Completed 90 calendar days after the date of the Notice to Proceed. A. No bidder may withdraw his bid after the time established for receiving bids or before the award and execution of the contract, unless the award is delayed for a period exceeding ninety (90) calendar days after the day of Bid opening. Bidders who withdraw their bid after Bid opening, but before expiration of said period, shall forfeit their bid security if Notice of Intent to Award to the successful Bidder is made by OWNER. A. This project is OWNER funded and shall comply with the Utah Code 34-30-14. Payroll submittal will not be required. B. Bidders on this Work must be licensed in the State of Utah, for an amount equal to or greater than the amount of their bid and for the type of work required, at the time of bidding and throughout the period of the contract. Question Deadline 07/31/2024 change from 08/04/2024 12:00 AM All requests for interpretation of the Contract Documents shall be made in writing and delivered to the ENGINEER no later than seven (7) calendar days prior to opening of Bids. In the ENGINEER'S discretion, ENGINEER will send the written interpretation to all persons receiving a set of Bid Documents in the form of an Addendum. If the ENGINEER does not respond to a Bidder's request for interpretation the Bidder shall comply with the intent and terms of the Con

Award

Water / Sewer

$169,485.00

Public - City

Site Work

15

14

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
109
Active Projects
72
Bidding Soon
997
All Active Projects
402
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 13, 2024

September 12, 2024

December 15, 2024

img_map_placeholder

Multiple Locations, West Valley City, UT

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.