Published August 7, 2024 at 8:00 PM

Updated August 16, 2024

Demolition and site work for a military facility in Sweeden, Kentucky. Completed plans call for the demolition of a military facility; and for site work for a military facility.

The contractor shall furnish all personnel, equipment, supplies and materials necessary to Demolish the Existing Project Office and adjacent storage building at Nolin River Lake, located at 2150 Nolin Dam Rd. Bee Spring, KY. 42207. Prices should include mobilization & de-mobilization, fuel, labor, material, equipment and any applicable permits. The contractor's work and responsibility shall include all planning, programming, administration, management, supervision, communications and inspection necessary to assure that all work is conducted in accordance with the contract requirements and all applicable Federal, State and Local laws and regulations. All work shall be performed in strict compliance with the attached specifications and all other terms and conditions incorporated herein. Work will begin within 10 calendar days of the Notice to Proceed (NTP) and will conclude 120 calendar days after the NTP. Quotes are due on 15 Aug 2024 at 11:00 AM Eastern Time. You may submit your quote to Donavon.j.waterbury@usace.army.mil This scope of w ork includes demolition of the Nolin Lake Project Office, the adjacent storage building, disposal of w aste materials, and grading of demolition site. Prices shall include mobilization & de-mobilization, fuel, labor, material, equipment, disposal, and any and all applicable permits to demolish and dispose of the Project Office and storage building components at Nolin River Lake. Estimated construction costs is betw een $100,000 and $250,000 per FAR 36.204. One firm - fixed price construction contract w ill be aw arded based on the low est priced quote. NAICS code: 238910 Size Standard $19 Million This project is set aside 100% for small buisness. Per Block 12A below : In lieu of both Performance and Payment Bonds, per FAR 52.228-13 Alternative Payment Protections, and FAR 28.102-1(b)(1), only a Payment Bond or Irrevocable Letter of Credit (ILC) is required. A performance bond is not required. Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team. Deadline for all questions via ProjNet will be 12 Aug 2024 with all questions answered by 14 Aug 2024. This scope of w ork includes demolition of the Nolin Lake Project Office, the adjacent storage building, disposal of w aste materials, and grading of demolition site. Prices shall include mobilization & de-mobilization, fuel, labor, material, equipment, disposal, and any and all applicable permits to demolish and dispose of the Project Office and storage building components at Nolin River Lake. Technical inquiries and questions relating to proposal procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at http://www.ProjNet.org/ProjNet. As noted below, Bidders shall not submit their proposals via ProjNet. CONTRACT START AND COMPLETION DATES. Work under this contract will begin within 14 calendar days of Notice to Proceed (NTP) and complete within 90 calendar days after receiving the NTP. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Military

$250,000.00

Public - Federal

Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
176
Active Projects
56
Bidding Soon
1,570
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 15, 2024

August 29, 2024

Project location map

2150 Nolin Dam Rd, Sweeden, KY

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed