Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 9, 2025 at 8:00 PM
Updated July 10, 2025
Site work, paving, new construction and renovation of a mixed-use development in Palm Coast, Florida. Completed plans call for the construction of a 10,500-square-foot, one-story above grade fire / police facility; for site work for a fire / police facility; for the renovation of a fire / police facility; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.
As of July 9, 2025, construction is underway for both Fire Station #22 and Fire Station #26. Construction on Fire Station #22 started March 2025. The duration of the project will be as 13 months. Constrtruction on Fire Station #22 will end April 2026. Construction on Fire Station #26 started on April 2025 and will end on May 2026. Construction on Fire Station #25 will start August 2025 and will end November 2025. *The original solicitation is listed below for historical reference. Wharton-Smith, Inc. is proudly the Construction Manager serving the City of Palm Coast. We are soliciting bids from prequalified subcontractors for the construction of the New Palm Coast Fire Station #22, New Palm Coast Fire Station #26 and Renovation of Palm Coast Fire Station # 25 . The new Fire Stations (#22 & 26) are prototype/identical buildings that consist of: Construction of (2) new 10,500 SF single story CMU, fire stations, with PVC roofs and include the following trades: earthwork, underground utilities, paving, irrigation, landscaping, fencing, concrete (including heavy duty), masonry, structural steel, PVC roofing, sealants, doors, frames & hardware, overhead doors, specialty 4-fold bay doors, windows, storefront, gypsum wallboard assemblies, acoustical ceilings, epoxy flooring/base/walls, resilient and tile flooring, hard tile, carpeting, acoustic panel ceilings, painting, signage, visual display & marker boards, toilet compartments & accessories, firefighter grid lockers, flagpoles, bike racks, food service specialties, casework, fire sprinklers, plumbing (including nat. gas and compressed air), HVAC and electrical and technology (including nat. gas emergency generator, Access Control, A/V, CCTV, Video Surveillance, BDA & fire station alerting system). The following are differences between the new fire stations: FS #22 contains Battalion Chief Quarters/Office and a freestanding Firefighter Training stair tower. FS #26 has no battalion Chief quarters and no training stair tower but includes an above ground Confined Space Training Prop (RCP pipe and structures). Existing Fire Station # 25 consists of: Adding heavy duty paved entrance and drive lane, replacing the existing sectional overhead doors with new 4-fold bay doors, Infill of door opening with CMU, plumbing (including replaced tankless water heater and assoc. natural gas), HVAC flue vent and electrical and technology. The projects may be awarded to separate trade contractors as stand-alone projects The projects will be constructed in a staggered concurrent manner to allow subs to utilize the same labor forces on all 3 projects Anticipated award date is December 2024Anticipated mobilization February 2025New Fire Stations will have 13-month construction durations MBE/WBE Subcontractors & Suppliers are encouraged to participate. Payment & Performance Bonds may be required.
Under Construction
Fire / Police
$5,000,000.00
Public - City
New Construction, Paving, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 5, 2024
March 10, 2025
Multiple Locations, Palm Coast, FL
Related To This Project
Palm Coast, FL
--
Palm Coast, FL
Bid Date: Sep 25 2024
Palm Coast, FL
Bid Date: Aug 22 2024
Palm Coast, FL
Bid Date: Aug 29 2024
Palm Coast, FL
Bid Date: Oct 30 2024
Palm Coast, FL
Bid Date: Aug 06 2024
Palm Coast, FL
Bid Date: Aug 22 2024
Palm Coast, FL
Bid Date: Aug 08 2024
Palm Coast, FL
Bid Date: Jul 25 2024
Palm Coast, FL
Bid Date: Aug 06 2024
Palm Coast, FL
Bid Date: Aug 08 2024
Palm Coast, FL
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
