BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a military facility in Fort Benning, Georgia. Completed plans call for the renovation of a military facility.

The objective of this mechanical scope is to improve climate conditions in B304 and B2408 so that army standards for parachute storage (TM 10-1670-201-23) and soldier comfort can be better met, respectively. The following scope states the key objectives that must be met. Ensure field changes meet all the necessary codes/standards. Scope of Work The objective of this mechanical scope is to improve climate conditions in B304 and B2408 so that army standards for parachute storage (TM 10-1670-201-23) and soldier comfort can be better met, respectively. The following scope states the key objectives that must be met. Ensure field changes meet all the necessary codes/standards. Scope of Work for New Work in B304 1. Mechanical New Work a. Size, provide, and install Novel Aire recirculating dehumidifier or equivalent to serve the areas of parachute storage. Make any necessary changes to sprinkler layout to facilitate dehumidifier install. b. Size, provide, and install air curtains and overlapping clear PVC strip curtains for the rear roll-up door and the two rear entry doors. Enable automatic start if door is opened. Install any manual switch in a manner that discourages tampering or disabling of air curtain. Place cautionary floor markings in these areas with workers/forklift drivers. c. For the existing rear roll up door, install a means of control to enable three positions, down, partially up, and fully open. Set partially up to 7 d. Size, provide, and install a Rytec Spiral high speed roll up door or equivalent, in the front of B304. Place cautionary floor markings in these areas with workers/forklift drivers. Equip door with: i. ii. iii. Insulated panels, no window slats. Motion/presence detector/forklift sensor Pre-wired premium package iv. Control Box v. On/Off Key Switch e. Provide and install 4 wall mounted, 36 AirEye Big Ass Fans or equivalent. 2 on either end of building. Equip fans with: EC motor Variable speed controller Occupancy sensor Provide and install two industrial quality humidity sensors with audible alarms to be sounded if space exceeds 80%RH. Place on wall in vicinity of parachute storage. g. Unless explicitly offered, assume no controls support or as-built drawings; However, if approved, provide a minimum of 2 weeks of notice of when you will need Fort Moore controls support if approved. h. Provide temporary heating/cooling/dehumidification <80%RH if building HVAC will be down longer than 8hrs.

Post-Bid

Military

$2,000,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
58
Active Projects
35
Bidding Soon
439
All Active Projects
210
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 4, 2024

October 3, 2024

img_map_placeholder

To Be Determined, Fort Benning, GA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.