BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 12, 2024 at 8:00 PM

Updated August 13, 2024

Site work and paving for a playground / park / athletic field in Island Park, Idaho. Completed plans call for site work for a playground / park / athletic field; and for paving for a playground / park / athletic field.

A description of the work of this project can be summarized to include ground preparation and paving of the existing gravel John Muir Trail at Harriman State Park. Estimated Cost: $250,000 Plans, specifications, proposal forms and other information are on file for examination at the following locations: Idaho Dept. of Parks & Recreation, 4279 Commerce Circle, Ste. B, Idaho Falls, ID 83401 (208) 525-7121 ARC Document Solutions, 2700 W. Idaho St., Boise, ID 83702 (208) 342-4141 Blueprint Specialties, 6205 W. Overland Rd., Boise, ID 83709 (208) 377-0294 A bid bond in the amount of 5% of the total bid amount, including any add alternates, is required. Questions regarding this advertisement may be directed to Nathan Powers, IDPR East Region Construction Manager, (208) 497-1505. Questions concerning a bid must be directed in writing to the designated Design Professional (architect or engineer) no less than ten (10) calendar days before bids are due unless provided otherwise via an addendum.

Bid Results

Playgrounds / Parks / Athletic Fields

$289,290.00

Public - State/Provincial

Paving, Site Work

14

11

2

3

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
23
Active Projects
11
Bidding Soon
140
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 8, 2024

September 16, 2024

Project location map

3489 Green Canyon Rd, Island Park, ID

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.