BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 22, 2025 at 8:00 PM

Updated September 23, 2025

Renovation of a residential development in Island Park, Idaho. Working plans call for the renovation of a residential development.

Bid is cancelled Questions shall be emailed to tony.taylor@usda.gov. Questions are due by 12:00 noon (MT) on July 2, 2025. This is a PRE announcement. The is anticipated to be posted to Contract Opportunities on SAM.gov on or around June 23, 2025. SCOPE OF CONTRACT A. This project includes removing and replacing metal roofs on 10 housing units at the Island Park Administrative Site. B. The s tearing off and disposing of the existing roofing (down to the sheathing) and installation of new metal roofing, flashing, ridge vent, ice and water shield, vented soffit and fascia on 3 Bunkhouses, 3 Duplexes, and 4 Single-Family Homes. C. Optional work that may be awarded includes all work described above associated with: 1. Option #1: Remove and Replace Damaged Sheathing with 5/8" CDX Plywood. D. Quantities associated with these options are identified in the Schedule of Items. PROJECT LOCATION The project is located in the Ashton-Island Park Ranger District of the Caribou-Targhee National Forest, Fremont County, Idaho, in Section 27, T 13 N, R 43 E. It is located approximately 26 miles North of Ashton, Idaho. The project may be accessed from State Highway 20 and Forest Road 20137. SITE INFORMATION AND LIMITATIONS The following site conditions are considered incidental to the contract and the contractor will not be paid directly for any of the following items: 1. ion sites will be open to Forest Service Employees during ion. 2. All ion equipment shall be pressure washed before entering National Forest System lands. The removal of mud and debris from treads, tracks and undercarriage, with emphasis on axles, frame, cross-members, motor mounts, and underneath steps, running boards, and front bumper/brushguard assemblies will be required. The purpose is to reduce or eliminate the transportation of noxious weeds, which is required by Federal and State regulations. 3. Water is available at the site for ion purposes. Utilities are available at the site for ion purposes. 4. Toilet facilities are not available at the site. The Contractor shall provide temporary toilet facilities (porta-potty) at the site during all ion work. TRAFFIC CONTROL AND ION SIGNING No work that endangers, interferes, or conflicts with traffic or access to work sites shall be performed until a plan for satisfactory warning and handling of traffic has been submitted by the contractor and approved by the COR. ion signing for traffic control shall conform to the Manual of Uniform Traffic Control Devices (MUTCD). All traffic control signs will be placed in areas adequate for a truck pulling a fifth wheel trailer to be turned around. Contractor shall not be paid directly for this item, rather it will be considered incidental to other items of work listed in the Schedule of Items. WORK CAMPS, STAGING AND STORAGE AREAS A. Areas for staging operations and storage of materials shall be approved by the CO. The Contractor must request in writing for approval from the CO to stage work trailers on site. B. No overnight camping will be allowed on site. START DATE The anticipated start date is 08/01/2025. CONTRACT TIME Anticipated to be 365 Calendar Days. Work may be performed in 2025, or 2026. Once the project is started it must be completed within 90 calendar days. A is will be scheduled and revealed on the full . MAGNITUDE OF ION PROJECT Per FAR 36.204 (d) Between 250,000 and 500,000. BONDING: All offerors will be required to provide a Bid Bond (20) with their proposal submission. and Bonds (100 each) will be required of the successful awardee. The Government reserves the right to cancel this , either before or after the closing date. In the event the Government cancels this , the Government has no obligation to reimburse an offeror for any costs. This announcement serves as the Pre- notice only. Responses to this synopsis are not required. Questions shall be emailed to tony.taylor@usda.gov. Questions are due by 12:00 noon (MT) on July 2, 2025. Answers are expected to be provided within 3 business days The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Final Planning

Residential Subdivision

$500,000.00

Public - Federal

Renovation

18

17

4

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
25
Active Projects
13
Bidding Soon
142
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 23, 2025

March 23, 2026

Project location map

To Be Determined, Island Park, ID


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.