BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 23, 2025 at 8:00 PM

Updated June 24, 2025

This is a service / maintenance or supply contract in Wilmington, North Carolina. Contact the soliciting agency for additional information.

Professional Engineering Consulting Services SCADA / Generator / Controls Project. The method of Contractor Selection has not been Determined at this time. Question Deadline 08/20/2024 at 2:00 PM ET CFPUA will address questions regarding the Questions submitted after this time will not be addressed. Questions concerning this advertisement should be directed to Ben Guerrieri, Procurement Manager, Cape Fear Public Utility Authority, at bids@cfpua.org. Description of Services The scope of work is expected to include the services described below. No guarantee is expressed or implied by CFPUA that all services will be performed or that the selected consultant will perform all services associated with the project. CFPUA may terminate work or pursue other consultant selections at any phase of the project. CFPUA is in the process of consolidating the Town of Wrightsville Beach's water and wastewater system into its network. CFPUA has conducted a preliminary study and come to the following conclusions in order to transition the Town's current SCADA infrastructure and generator utilization into CFPUA's system. An MBE/WBE (SBE) Compliance Form is attached as Exhibit A to the RFQ that must be submitted with the qualification statement. Submitted information shall comply with N.C.G.S. 143-64.31 through 64.34 (akaMini Brooks Act). The project will generally consist of analyzing the current SCADA infrastructure at the Town of Wrightsville Beach's water and wastewater facilities and to convert this infrastructure into CFPUA's SCADA system, analyzing the Town of Wrightsville Beach's current generator utilization for its water and wastewater facilities and to adjust or modify this utilization to match CFPUA's standard for generators, developing contract drawings and technical specifications, obtaining necessary permits and approvals from authorities having jurisdiction, assisting in the bidding process, and providing construction administration and observation-based services. Cape Fear Public Utility Authority (CFPUA) requests Statements of Qualifications (SOQ) from consulting engineering firms for the design and engineering services of SCADA evaluation and replacement, as well as Generator evaluation and implementation at various Wrightsville Beach locations to include: water wells, water storage tanks, water treatment centers, and wastewater lift stations. This project will receive funding from the 2023 Appropriations Act, Session Law (S.L. 2023-134). SOQ's shall be limited to 25-pages or less, excluding cover page, table of contents, tabs, resumes and appendices. The CFPUA reserves the right to reject any and all Proposals.

Conceptual

Water / Sewer

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
88
Active Projects
46
Bidding Soon
592
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 24, 2025

Project location map

Multiple Locations, Wilmington, NC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.