BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 21, 2025 at 8:00 PM

Updated July 22, 2025

Site work for a water / sewer project in Wilmington, North Carolina. Completed plans call for site work for a water / sewer project.

The Authority's raw water supply is withdrawn and conveyed from the Cape Fear River above Lock & Dam #1 to the Sweeney Water Treatment Plant via two separate pipe systems, one owned by CFPUA, and one owned by the Lower Cape Fear Water and Sewer Authority. Prior to crossing the North Cape Fear River near Hwy 421, these separate conveyance systems converge into twin 48-inch prestressed concrete cylinder (PCCP) pipes that subsequently cross an industrial property at 1910 N. Terminal Road before merging into a tunnel crossing the river. These twin 48-inch PCCP pipes were installed in 1993 and have been in service for 32 years. Total Estimated Project Budget: $5,000,000 - $10,000,000 The project scope of work generally includes, but is not limited to the following primary tasks: o CFPUA contracted professional services to provide a comprehensive engineering analysis for each of three options, repair in place, full replacement within existing easement, and re-alignment within N. Terminal property for twin 48" PCCP raw water distribution pipes. o Estimate remaining useful life of existing assets while outlining optimal repair, protection, and replacement strategies o Technical memorandum summarizing analysis methodology and findings o Recommendations with cost estimates and implementation timeline for each option o This project will include all necessary survey, planning, design, technical specifications and construction for the desired option chosen by CFPUA & DB team. o The project will require all necessary permit approvals and certifications to complete the scope of work. o Existing raw water distribution must remain in service and adequately protected at all times. Construction March 26' - May 27' Substantial Completion July 27' *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Water / Sewer

$10,000,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
91
Active Projects
52
Bidding Soon
612
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 15, 2025

March 2, 2026

Project location map

1920 N Terminal Rd, Wilmington, NC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.