Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 26, 2026 at 8:00 PM

Updated November 1, 2026

Site work, paving and new construction of a municipal facility in Spokane, Washington. Working plans call for the construction of a municipal facility.

TIMELINE: As of October 26, 2026, the project is in the design development phase. Construction documents are expected to be completed in early February 2027, followed by trade partner bidding which is anticipated to take place between February and March 2027. A firm construction timeline has not been determined. The Northeast Pubic Development Authority (NEPDA) requests qualifications from Progressive Design-Builders to construct a new Mixed-use Development using the procedure permitted under Chapter 39.10 of the RCW, as amended, for selected projects for public works contracting in lieu of sealed bids. The project consists of a mixed-use residential over commercial building, with associated parking and utilities The estimated GMP is approximately $10.26M Validation and design are expected to begin in October 2024. Construction is expected to begin by spring of 2025 and completed by April 2026 for NEPDA use. The Progressive Design-Builder shall provide high-quality services including validation, scheduling, phasing logistics, collaboration with the design consultants, manage and estimate design budgets and design contingency solutions, direct construction best-practices, organize design investigative work and provide assistance in the selection of materials and building systems, solicit and manage subcontractor bid packages and supplier bidding. Questions should be addressed to Jamie Kelly, Turner & Townsend Heery via e-mail jamie.kelly@turntown.com.

Pre-Construction/Negotiated

Municipal

$10,260,000.00

Public - City

New Construction, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
46
Active Projects
16
Bidding Soon
346
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 20, 2024

May 3, 2027

Project location map

To Be Determined, Spokane, WA

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed