BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 1, 2026 at 8:00 PM

Updated April 2, 2026

Renovation of a playground / park / athletic field in Patterson, Missouri. Working plans call for the renovation of a playground / park / athletic field.

**As of April 1, 2026, bids received were rejected. No definite date for the rebid.** The project includes renovation of 6 historic cabins in Sam A. Baker State Park. The cabins interiors will be renovated toaccommodate a living room with a functional electric fireplace, bedrooms, a kitchen with new cabinets, fixtures, and appliances, bathrooms with new fixtures and finishes, and a storage and mechanical/utility room. The cabin renovations will include mechanical, electrical and plumbing replacement. The exterior construction includes reroofing, repair of the historic wood lap siding, heavy timber repair, stone masonry repointing, exterior door and window repair, and painting of all exterior wood surfaces. The site work includes exterior access, lighting, and adequate storm drainage from all sides of the cabins. MBE/WBE/SDVE Goals: MBE 10%, WBE 10%, and SDVE 3%. NOTE: Only MBE/WBE firms certified by the State of Missouri Office of Equal Opportunity as of the date of bid opening, or SDVE(s) meeting the requirements of Section 34.074, RSMo and 1 CSR 30-5.010, can be used to satisfy the MBE/WBE/SDVE participation goals for this project. The State reserves the right to reject any and all bids and to waive all informalities in bids. No bid may be withdrawn for a period of 20 working days subsequent to the specified bid opening time. The contractor shall pay not less than the prevailing hourly rate of wages for work of a similar character in the locality in which the work is performed, as determined by the Missouri Department of Labor and Industrial Relations and as set out in the detailed plans and specifications.fv Question Deadline 02/03/2026 Bidders shall make all requests for interpretations in writing and submit all requests to the Project Designer and Project Manager identified in Section 007300 - Supplementary Conditions with all necessary supporting documentation no less than five (5) working days before opening of bids.

Final Planning

Playgrounds / Parks / Athletic Fields

$300,000.00

Public - State/Provincial

Renovation

110

48

10

2

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
81
Active Projects
39
Bidding Soon
377
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 10, 2026

October 1, 2026

Project location map

5580 MO-143, Patterson, MO


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.