BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 21, 2024 at 8:00 PM

Updated August 22, 2024

Site work for a water / sewer project in Vredenburgh, Alabama. Completed plans call for site work for a water / sewer project.

DBE/MBE Participation - 2.5% WBE Participation - 3% Questions received less than ten days prior to the date for opening of Bids may not be answered. Vredenburgh Sewer Infrastructure Improvements Project Contract 2. The Work of Providing Labor, Equipment, and Material for the of the Vredenburgh Sewer Infrastructure Improvements Project Contract 2 Vredenburgh Constructed Wetland Lagoon Improvements Projectcwsrf Project No. Cs011002-01. The Principal Items of Work Are Detailed Herein Below: 1. Miscellaneous Site Work Within the Treatment Site Property Boundary 2. Install an Access Road 3. Miscellaneous Berm Improvements 4. Miscellaneous Outfall Improvements. The successful bidder must furnish a Performance Bond for one hundred (100%) of the bid amount and a Payment Bond for one hundred (100%) percent of the bid amount and must secure his bond from a bonding company's representative or agent in the State of Alabama. The Contractor is hereby advised that TIME IS OF THE ESSENCE on this project and that the contract time of 30 consecutive calendar days total and noted restrictions shall be strictly observed. LIQUIDATED DAMAGES WILL BE ASSESSED IF CONTRACT TIME IS EXCEEDED. The Contractor may apply for an extension of time in accordance with the provisions of the contract; however, such an extension must be approved prior to the contract completion date to avoid the imposition of liquidated damages. The Owner reserves the right to reject any or all bids, to waive any informality in any bid, and to accept any bid considered advantageous to the Owner. No bid may be withdrawn after the time for opening bids has passed. The Owner reserves the right to hold the bids for a period of sixty (60) days after the date of receiving the Bids. The contractor shall note that funds for this project are provided through CWSRF (Clean Water State Revolving Funds). All Applicable Federal Guidelines must be met. There will not be a Pre-Bid meeting. Document notes. No refunds will be made except to Prime Contractor Bidders, which shall be refunded for one bid set.

Bid Results

Water / Sewer

$98,846.00

Public - City

Site Work

3

17

2

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
6
Active Projects
0
Bidding Soon
231
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 15, 2024

September 16, 2024

Project location map

Multiple Locations, Vredenburgh, AL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.